1) deep unloaded fissures
深部卸荷裂隙
3) deep unloaded band
深卸荷带
1.
Formation cause analysis of deep unloaded band of rock mass in left dam shoulder of Jinping hydropower station;
锦屏水电站左坝肩岩体深卸荷带成因分析
4) relaxed-tension crack
卸荷拉裂
1.
Based on the introduction of basic geological characteristics and relaxed-tension crack feature of a typical bank slope with relaxed-tension crack, the state and trend of bank slope stress are analyzed before and after tension crack formation as well as after water storage of the reservoir.
在简述某典型卸荷拉裂岸坡基本地质特征及卸荷拉裂特征的基础上,通过三维有限元数值模拟,分析了拉裂缝形成前、后岸坡的应力状态,以及库区正常蓄水后岸坡应力场的发展趋势。
5) Deep bearing tectonic fracture water
深部承压构造裂隙水
6) partial relief
部分卸荷
补充资料:白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条