1) design and checking calculation
设计及验算
1.
Construction design and checking calculation of steel pipe pile of pier in water with floating crane with lift arms or bars;
用扒杆浮吊进行水中墩钢管桩施工设计及验算
2) Parameter Design & Checking
参数设计及验算
4) calculation and verification
计算及校验
1.
The realization method of 40 bit arbitrary CRC calculation and verification in TMS320C5000 series DSP is discussed in this paper.
论述了 4 0位以内任意长度的 CRC计算及校验在 TMS32 0 C5 0 0 0系列 DSP中的实现方法。
5) design & checkup
设计及检算
1.
It introduces several noteworthy problems in shuttering construction,illustrates design & checkup of strictly implemented strength、shuttering arrangement & design by computer software and strengthened handling of nodes & parts,and points out that constructive technology & measures affect constructive quality of concrete directly.
介绍了模板施工中应注意的问题 ,从严格执行强度设计及检算、引入计算机软件进行模板布置设计、加强对节点细部的处理等方面进行阐述 ,指出模板工程的施工技术与措施是否得当 ,将直接影响到混凝土的施工质量。
补充资料:验算
1.检查运算的结果有无差错。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条