1) cable tension
张拉索力
1.
This paper is concerned with monitoring and control calculation、discrete model and determination of cable tension and template elevation.
主要对该桥施工监控计算的计算方法、模型离散、斜拉索张拉索力的确定和挂篮立模标高的确定进行了论述。
3) the initial cable force
拉索初始张拉力
1.
Then trial method based on the forward analysis is used to determine the initial cable force of Xinyan cable-stayed bridge in the paper.
然后采用基于正装分析的试算法,确定了新园斜拉桥的拉索初始张拉力,最后本文还利用影响矩阵法进行了成桥后索力的调整计算。
4) cables forces under construction
施工张拉索力
5) cable tension index
斜拉索张力指标
1.
Taking cable-stayed Kap Shui Mun Bridge as an example, this paper presents a new damage locating method for cable-stayed bridges based on the combination of cable tension index and neural network technique.
以香港汲水门大桥为背景,探讨了斜拉索张力指标和神经网络技术相结合对桥面结构损伤的定位或分类方法。
补充资料:赤力力
1.亦作"赤历历"。 2.象声词。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条