1) bonded-in reinforcements group
植筋群
1.
Tensile experiments of bonded-in reinforcements group have been completed with embedment depth 10d and 15d(d is rebar diameter) respectively.
进行了埋深为10d和15d(d为钢筋直径)两种情况下植筋群受拉试验。
2) post-embedded bars
植筋
1.
Performance-based analysis of multiplex failure mode of post-embedded bars in concrete;
混凝土植筋复合破坏形态性能分析
2.
Low frequency cyclic loading tests of reinforced concrete(RC) exterior joints with post-embedded bars were performed after treatment at high temperature.
进行了现浇钢筋混凝土植筋边节点在不同受热温度(常温、植筋后焊接、200和300℃)后的低周反复荷载试验,分析了高温后钢筋混凝土植筋边节点构件在低周反复荷载作用下的破坏形态和恢复力特征,探讨了高温对钢筋混凝土植筋边节点抗震性能的影响。
3.
On the base of documents at home and abroad,this paper concluded current researches about post-embedded bars in RC structure including the studies of behavior of bound anchorage,bearing capacity and seismic resistance.
在国内外文献资料的基础上,从黏结锚固性能、承载力、破坏形态拉拔试验和抗震性能等几个研究方面,总结了植筋锚固性能的研究现状,针对植筋锚固性能的试验研究和理论分析,提出了有待进一步深入研究的课题。
3) bonded rebar
植筋
1.
This paper focused on pullout strength of bonded rebar under different temperatures.
设计制作了25个试件,试件的植筋深度为10d和15d,分别在高温下进行拉拔试验,来研究不同温度对不同植筋深度的钢筋拉拔承载力的影响。
2.
Based on the bearing capacity experimental investigation of bonded rebar by using the cement based inorganic anchoring material,failure form and mechanism of this material is analyzed.
通过对水泥基无机黏结材料植筋承载力的拉拔试验研究,分析了水泥基无机黏结材料植筋的破坏形态和破坏机理,讨论并给出了极限锚固承载力计算公式及建议施工锚固长度表格。
3.
To study the load transfer mechanism of bonded rebars failed on combination interface,the bonded rebars systems of concrete block which are failed on combination interface are studied by nonlinear FE analysis method.
自由拉拔植筋系统破坏时发生复杂的混合界面拔出型破坏,为了研究其粘结滑移受力机理,对该植筋系统进行了考虑粘结滑移的非线性有限元分析。
4) planting reinforcing bar
植筋
1.
Experimental study on the factors influencing the anchorage performance of planting reinforcing bar;
影响植筋粘结锚固性能主要因素的试验研究
2.
Combined with practical work utilizing planting reinforcing bar technology the structures of young and old concrete can be united as one.
根据工程现场实际情况,在防漏方面着重强调结构处理,采用植筋新技术使新旧混凝土结构成为一体,在防渗方面主要从新旧混凝土结构接触面处理和采用柔性紫铜复合GB板的新材料新技术,为处理一些常见的水工问题提供一些新经验。
3.
The construction technology of planting reinforcing bar(anchoring reinforcing bar) and its calculating method of anchored force, on the corbel of the on\|off motor room of the Sanhe flood gate are described.
介绍了三河闸启闭机房牛腿植筋 (锚筋 )施工技术及其锚固力计算方法 ,为类似锚固工程提供参
5) rebar-planting
植筋
1.
Engineering application of rebar-planting anchorage technique;
植筋锚固技术在工程中的应用
2.
Post-installed anchorage technology and its two main types: rebar-planting and anchorage are introduced as well as the development of adhesive materials for rebar-planting and the bearing principle and installation method of anchor blot.
介绍了后锚固技术及其两种主要形式,简述了植筋粘接材料的发展及锚栓的承载原理和安装方式,并列举了影响锚栓承载性能的一些参数,最后对后锚固技术发展和存在的问题作了分析。
3.
The rebar-planting anchorage technique is analyzed and discussed from principle, technical features, construction method and other aspects.
对植筋锚固技术进行了分析 ,从工艺原理、工艺特点、植筋设计、主要工艺流程、施工方法等方面进行了论述 ,指出植筋锚固技术可以满足该加层工程结构的特点 ,能够达到保证工期和质量的要
6) planting bar
植筋
1.
Combining practical projects, authors introduce some construction methods used in this strengthening project such as planting bars, installing shear connectors, manually chiseling ducts on original structures to enlarge section areas of frame columns and to thicken the base board of foundation and so forth.
结合工程实例,详细介绍了通过植筋、设置剪力键、原结构人工剔凿沟槽实现框架柱截面加大和基础底板加厚的施工工艺,并将工程中的重点、难点做了总结。
2.
The paper deals with the design principle and the construction method of planting bar.
植筋技术属于新型的钢筋锚固技术 。
3.
The failure mechanism of planting bar system, main failure modes, and calculation methods of bearing capacity are analyzed.
阐述了植筋锚固系统的组成形式,受力特点和主要用途。
补充资料:草坪植生带建植方法
草坪植生带具有重量轻、运输方便、铺设简单等优点。它是工厂化生产出来的,适用于平地、斜坡和陡坡上大量铺植草坪,不会因降雨或浇水而引起种子或水土流失,在我国北方被广泛应用。
笔者在几年的实践中总结出草坪植生带的建坪方法,现介绍如下:
一、场地准备
1.首先要充分了解当地的年降雨量、地形及土壤状况和酸碱度。降雨量多且集中的地区,排水设施应放在首位;降水量少的干旱地区,喷灌系统则更重要。低洼地带应回填土,避免场地积水。土壤最好是沙质壤土。
2.整地—般分粗整和细整两种。粗整包括排灌设施的埋设、换土、清理垃圾、填土等。细整包括施入改良材料、肥料及表面平整。一定要用钉耙细细整平,做到表面无土块,排水坡度适当。
二、建坪方法
我国北方地区建坪—般在4月中旬以后进行。植生带的宽度多为1米。首先选择一块长1.2至1.5米、宽5至10厘米,至少有一侧平滑的木板,在用钉耙耙过的平整土地上轻刮,去除较大的土壤颗粒,使土层表面光滑。将成卷的草坪植生带平铺在地面,上面覆盖一层薄簿的细土,覆土厚度以不超过1厘米为好,之后用镇压滚滚压,以利于植生带贴紧地表。
三、铺植后的管理
植生带铺好后即喷水保湿,一般十几天内即可发芽。喷水时水珠宜小,最好是雾状。为了保证喷水均匀,应尽量做到少量慢喷,以湿到地下3至5厘米为宜。喷水次数要视坪床干湿度而定,一般是每天二三次,遵循均匀、少量、多次的原则,最好预先安装喷灌设施。经过细致的管理,一般一两个月后可形成嫩绿的草坪。(来源:《中国花卉报》2004.06.01)
笔者在几年的实践中总结出草坪植生带的建坪方法,现介绍如下:
一、场地准备
1.首先要充分了解当地的年降雨量、地形及土壤状况和酸碱度。降雨量多且集中的地区,排水设施应放在首位;降水量少的干旱地区,喷灌系统则更重要。低洼地带应回填土,避免场地积水。土壤最好是沙质壤土。
2.整地—般分粗整和细整两种。粗整包括排灌设施的埋设、换土、清理垃圾、填土等。细整包括施入改良材料、肥料及表面平整。一定要用钉耙细细整平,做到表面无土块,排水坡度适当。
二、建坪方法
我国北方地区建坪—般在4月中旬以后进行。植生带的宽度多为1米。首先选择一块长1.2至1.5米、宽5至10厘米,至少有一侧平滑的木板,在用钉耙耙过的平整土地上轻刮,去除较大的土壤颗粒,使土层表面光滑。将成卷的草坪植生带平铺在地面,上面覆盖一层薄簿的细土,覆土厚度以不超过1厘米为好,之后用镇压滚滚压,以利于植生带贴紧地表。
三、铺植后的管理
植生带铺好后即喷水保湿,一般十几天内即可发芽。喷水时水珠宜小,最好是雾状。为了保证喷水均匀,应尽量做到少量慢喷,以湿到地下3至5厘米为宜。喷水次数要视坪床干湿度而定,一般是每天二三次,遵循均匀、少量、多次的原则,最好预先安装喷灌设施。经过细致的管理,一般一两个月后可形成嫩绿的草坪。(来源:《中国花卉报》2004.06.01)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条