说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 双杆基础
1)  double pole foundation
双杆基础
2)  pole foundation
杆塔基础
1.
Aimed at destabilization of foundation leading to pole failure of transmission line by frozen-heave of soil,it is discussed that frozen foundation affects on stabilization of pole foundation.
针对送电线路杆塔在高寒地区发生因地基土冻胀基础失稳造成的倒杆及倒塔的问题,研究探讨了冻土地基对杆塔基础稳定的影响原因、影响程度及防冻胀措施,为在架空输电线路杆塔地基与基础设计中消除或减少地基土冻胀危害,提供了具有实用价值的地基冻胀力的分析、计算方法和防冻胀的措施。
3)  foundation tension rod
基础拉杆
1.
The overlong post-tensioned concrete foundation tension rod in actual engineering is introduted in this paper,which includes the construction program and calculation concerning setting-up holes,through wire,stretching,hole setting-up holes,grouting and so on.
以实际工程为例,详细介绍了超长预应力混凝土基础拉杆的施工技术。
4)  tower foundation
杆塔基础
1.
The transmission tower foundation is different from normal building foundations because the transmission lines are of long distance,broad crossed areas,complex topography and geological conditions and great difference of the physical mechanical nature of the foundation soil.
杆塔基础除承受拉、压交变荷载外,还承受着较大的水平荷载。
2.
According to typical geological and topographic features of northwest region and large load requirement of foundations of compact 750 kV double-circuit transpose towers,studies on tower foundation selection and design optimization are carried out,and suitable foundation types are proposed.
基于西北地区典型的地质地貌特征,结合750 kV同塔双回紧凑型输电线路杆塔基础大荷载的要求,对杆塔基础开展选型方案与设计优化等方面的研究,有针对性地提出了适用的杆塔基础类型。
5)  pole-foundation
电杆基础
6)  anchored bolt foundation
锚杆基础
1.
The anchored bolt foundation hasn\'t been studied and applied in this geological condition.
大节理裂隙岩体是广东清远地区输电线路的主要地质条件,对这种地质条件下锚杆基础未有研究与应用先例。
补充资料:经济基础(见经济基础与上层建筑)


经济基础(见经济基础与上层建筑)
economical basis

  J ingji Jiehu经济基础与上层建筑。(eeonomiealbasis)见经济基础
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条