1) grouting elevation
灌浆高程
1.
For the problem of dam-powerhouse connection type and flat joint grouting elevation of hydropower station,this paper establishes a three-dimensional finite element model by the mixed finite element method of the contact problem and calculates the deformation and stress variation of dam body,dam-powerhouse connection and powerhouse for the ten different joint grouting elevations,respectively.
针对某水电站厂坝连接方式及平缝灌浆高程问题,采用接触问题有限元混合法建立了三维有限元模型,分别计算了10个灌浆高程下坝体、厂坝连接处、厂房的变形及应力变化,据此分析出采用平缝连接、且平缝灌浆到进水管底高程就可确保坝体及厂房的稳定。
2) grouting engineering
灌浆工程
1.
The requirements of flow instrument in grouting engineering and adaptation of electromagnetic flowmeter are concluded.
归纳了灌浆工程对流量仪表的要求和电磁流量计的适应性;阐述了灌浆过程的主要工艺,如压水试验,灌浆等对流量仪表的要求;提示应用中需注意的事项,如操作工艺的影响,流量计测量管内附浆量的影响,介质中气泡的影响以及潮湿和高灰尘的环境引起的故障等。
2.
The paper mainly focuses on how to apply partnering model to the quality management of grouting engineering.
本文主要是围绕如何将Partnering模式引入到灌浆工程项目的质量管理过程中。
3) grouting project
灌浆工程
1.
Strengthening the management of grouting project to enhance the quality of grouting project;
加强灌浆工程管理 提高灌浆工程质量
2.
The author, from the construction need of Guan-Di hydropower station and the properties of the two pastes, thinks that the use of steady paste, mostly used in GIN, in grouting project can get a better effect than the ordinary one.
在大坝灌浆工程中,浆液的选择非常重要,直接关系到受灌体的物理力学性能、施工工艺、施工工期等。
5) grouting works
灌浆工程
1.
As underground works,the measurement of quantity of grouting works is complicated and changeful.
灌浆工程是隐蔽工程,灌浆工程的计量具有复杂性和多变性。
6) grouting procedure
灌浆程序
补充资料:大地高程
见高程系统。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条