1) Tingzitang hydropower plant
厅子塘水电站
2) TangKou hydropower station
塘口水电站
1.
The TangKou hydropower station is based on the chap ash-rock,which develops much fault and cranny,the integrality of rock body is poor and the penetrate ability is strong,the influence of the construct quantity and long time run,many central leakage appear in the grouting gallery and drain gallery of the dam.
塘口水电站大坝基础座落在断层和裂隙较发育的龟裂纹灰岩上,岩体完整性差、透水性强,多年运行后,大坝灌浆廊道和排水廊道出现多处集中性漏水,为确保大坝安全和电站正常发电,根据渗漏性质和成因,采用对灌浆廊道补充帷幕灌浆,对排水廊道进行固结+帷幕+回填灌浆。
3) Yutang Hydropower Station
鱼塘水电站
1.
Application of Pump for Delivering Concrete With Graduation Ⅲ in Concrete Construction of Yutang Hydropower Station;
三级配混凝土输送泵在鱼塘水电站混凝土施工中的应用
2.
Based on setting up 3D model and with analysis software of ANSYS,spillway brake-room of Yutang hydropower station were calculated by 3D finite element method to emphasis analyze the state of stress and strain of the section of anchor and cattle-leg.
通过建立三维模型,应用ANSYS分析软件,对鱼塘水电站溢洪道闸室进行三维有限元计算,重点分析了预应力锚固端和牛腿部位的应力和应变,为鱼塘水电站溢洪道闸室的设计提供了依据,也为今后的实际工程提供了有意义的参考。
4) Pingtang hydropower station
平塘水电站
1.
Quality control experience derived in supervision for Pingtang hydropower station;
平塘水电站监理质量控制工作体会
5) Wantang Hydroplant
湾塘水电站
1.
Atomization measurement for Wantang Hydroplant;
湾塘水电站泄洪雾化原型观测
6) the Shuijingtang hydropower station
水晶塘水电站
1.
Elementary discussion on construction scheme of the diversion tunnel of the Shuijingtang hydropower station;
浅谈水晶塘水电站引水隧洞的施工方案
补充资料:都厅
1.尚书省的总办公厅。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条