1) transferring vertices
移动顶点
2) vertices transferring
顶点移动
3) vertex-moving method
顶点移动法
4) top displacement
顶点位移
1.
Design based on top displacement of confined boundary zones in a tall shear wall structure
某高层剪力墙约束边缘构件基于顶点位移的设计
2.
With the help of the software ANSYS,this article calculated shear wall top displacement under different transverse load,thus calculated shear wall equivalent stiffness under the conditions of the corresponding load in accordance with design requirements,providing a new way for calculation of equivalent stiffness of the open-cross shear wall.
利用商用程序ANSYS计算不同横向荷载作用下剪力墙顶点位移,从而根据设计需求计算相应荷载工况下剪力墙等效刚度,为规则和非规则开洞剪力墙的等效刚度的计算提供了一种新途径。
5) top drift
顶点侧移
1.
Seismic behaviors of plate-column structure are evaluated from some aspects including top drift of structure subjected to wind load and frequently occured earthquake,result of pushov.
基于板-柱结构及板柱-剪力墙结构的概念和设计方法现状,从风载和常遇地震作用下结构的顶点侧移,静力弹塑性分析结果,节点抗震性能以及结构振型分析等几个方面,评价了板-柱结构的抗震性能,并对板柱-剪力墙结构的抗震性能进行了初步探讨。
6) apex offset
顶点偏移
补充资料:顶点
①角的两条边的交点;锥体的尖顶。②最高点;极点:比赛的激烈程度达到了~。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条