1) reversed cyclic loading
低周反复加载
1.
The test of 6 hybrid precast unbonded post-tensioned concrete beams under reversed cyclic loading is carried out.
本文采用碳纤维布和外包钢两种加固方法,对6个混合装配无粘结预应力梁进行了低周反复加载试验。
2.
In this paper,seismic performances of unbonded post-tensioned precast concrete joints strengthened with CFRP and angle steels under reversed cyclic loading are studied.
本文采用碳纤维布和外包钢两种加固方法,对无粘结后张预应力装配梁、柱节点进行了低周反复加载试验研究。
3.
This test research 3 hybrid precast unbonded post-tensioned concrete beams under reversed cyclic loading.
为了提高预应力装配结构的耗能能力和抗震性能,对3个混合装配无黏结预应力梁进行了低周反复加载试验研究,考虑了初始预应力度、后穿非预应力筋的强度和面积等参数变化。
2) low-reversed cyclic loading test
低周反复循环加载试验
3) low-cycle reversed loading experiment
低周反复加载试验
1.
A low-cycle reversed loading experiment of the steel frame with two stories and two spans has been completed.
提出了梁端楔形翼缘连接节点,通过2跨2层梁端楔形翼缘连接钢框架试件的低周反复加载试验,研究了结构在地震作用下的滞回性能、耗能机制、耗能能力、刚度退化和破坏形态。
4) horizontal low cyclic loadings test
低周反复水平加载试验
1.
Through the horizontal low cyclic loadings test of different thickness shear wall,the whole destroying process of shear wall is observed,and the properties of strength,deformation and energy are analyzed.
对不同厚度的墙体进行了低周反复水平加载试验,观测了墙体的整个破坏过程,分析了墙体的强度、变形和能量特性。
5) low-cycle and reverse horizontal loading test
低周反复水平加载试验
6) low cyclic loading
低周往复加载
1.
OpenSees software is used to carry out static pushover analysis and low cyclic loading analysis on the CFRP retro-fitted reinforcement concrete short column,and the results are contrasted with the results simulated by ANSYS.
采用地震工程开源模拟软件OpenSees对CFRP加固RC短柱进行了静力Pushover分析和低周往复加载分析,并与通用有限元软件ANSYS模拟结果进行对比研究。
补充资料:低加浓铀
分子式:
CAS号:
性质:铀中含有0.71%<235U<5%(质量)为低加浓铀。轻水堆中使用的铀燃料含235U的浓缩度约在2%~4%(质量),属低加浓铀。通过耗费大量电力的同位素分离工艺获得。
CAS号:
性质:铀中含有0.71%<235U<5%(质量)为低加浓铀。轻水堆中使用的铀燃料含235U的浓缩度约在2%~4%(质量),属低加浓铀。通过耗费大量电力的同位素分离工艺获得。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条