1) Low voltage load
低压负荷
2) under voltage load shedding(UVLS)
低压切负荷
1.
Optimization and coordination of under frequency load shedding(UFLS) and under voltage load shedding(UVLS) are hybrid optimization problem involving discrete and continuous variables,considering multi-condition,multi-scenario,multi-control-bus and multi-step-control.
低频切负荷和低压切负荷的协调优化是离散变量(地点和轮次)和连续变量(各轮的控制量)的混合优化问题。
3) under_frequency and under_voltage unloading
低频低压减负荷
4) low-pressure high-loaded turbine blade
低压高负荷叶栅
5) low-voltage appliance loads
低压民用负荷
6) high load LP turbine
高负荷低压涡轮
1.
A four-stage high load LP turbine was optimized and redesigned by applying multistage aerodynamic optimization design process.
采用多级涡轮气动优化设计流程对某四级高负荷低压涡轮进行多级气动优化设计。
补充资料:自动低压减负荷
自动低压减负荷
automatic under volt-age load shedding
z一dong dlyaJ旧nfuhe自动低压减负荷(automatic under volta罗load shedding)为防止电力系统发生事故后引发电压崩演(见电力系统电压崩清)导致大面积停电而采用的技术措施。它的功能是,当电网运行电压低到一定值时自动切除一部分用电负荷,使电网运行电压恢复到正常水平。实现这种功能是依靠核心部件为低电压继电器的自动装t。自动装t的低电压起动值是经过分析计算而整定的,可以分级、分批切除用电负荷。 自动低压减负荷装工一般安装在负荷集中且无功电源不足的地区,同自动低颇减负荷装t(见自动低级减负待)配合使用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条