1)  construction measurement
施工放线
1.
With the example of China Dinosaur Park,inner works calculation method of construction measurement to complicated arc building based on CAD platform is given,which make the inner works calculation easier and save a lot of time,reduce the chances of errors and improve the accuracy of construction measurement.
以中华恐龙馆为例,介绍了采用CAD进行复杂弧形建筑施工放线的内业计算,使得内业计算变得很简单,节省了很多时间,减少了错误的机会,精度也得到提高。
2)  construction
施工
1.
The application of overall safety management in the construction of bridge;
全面安全管理在桥梁施工中的应用
2.
Drawing Up a Completed Project Technical File in Construction Stage of Chemical Industry Construction Item;
化工建设项目施工阶段交工技术文件编制
3.
Questions existed in construction of building fire protection facilities and countermeasures;
浅谈建筑消防设施施工存在的问题及举措
3)  application
施工
1.
The application of construction machine in the rural roads;
浅谈农村公路施工机械的使用
2.
Study and application of a glaze-surface putty of quick dry at room temperature;
常温快干釉面腻子的研制与施工
3.
The critical consideration is attached to rust removing,application of anti-corrosion and fireproof coatings and its quality control.
根据钢结构防护效果与基体表面预处理品质、防腐防火涂料的涂装品质及施工环境的关系,提出了一套钢结构涂层防护施工品质的控制方法,具有较好的可操作性和实用性。
4)  construct
施工
1.
Brief Analysis on the Smooth-traffic Project during the Reconstruction of Old Roads;
浅析老路改造施工期间的保畅工程
2.
Importance of management for OPGW constructing process;
从一次OPGW的施工故障看施工过程管理的重要意义
3.
The Organization and Management of the Construction in Preparatory Stage;
施工准备阶段的组织管理
5)  operation
施工
1.
Fracturing sand control plan and matters often neglected in operation process and solution method;
压裂防砂技术设计和施工过程中常忽略的几个问题及解决方法
2.
Bus Interior Trim Design and Operation;
现代客车内装饰设计与施工
3.
Several problems of designing and operation for pretension concrete piles;
预应力管桩设计与施工的几个问题
6)  installation
施工
1.
In this paper,the structure of steam superheater (A BA701) lining,its installation method and points for attention during installation are introduced in detail.
本文详细地介绍了某厂蒸汽过热器 ( A— BA70 1 )衬里的结构、施工方法及施工中的注意事项 ,对结构相同或相似衬里的施工有着指导意义 。
2.
The author of this paper presents some proposals about the production and appropriate lay-out in installation of large size ACSR.
大截面钢芯铝绞线在生产上并不复杂,但从各大电网公司输变电施工等部门反馈的信息来看,产品仍有诸多的缺陷。
3.
Base on actual engineering on prestressed concrete pipe piles applied in deep foundation pit,issues of designing and installation are discussed.
本文介绍预应力管桩在深基坑支护工程应用的工程实例,探讨基坑支护采用管桩在设计、施工中应注意的若干问题,并作出相应的建议,对设计和施工人员有一定的借鉴意义。
参考词条
补充资料:放线验线应注意哪些事项

放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。