说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 恒定流
1)  steady flow
恒定流
1.
Firstly,based on node equation method,a water distribution pipeline network steady flow mathematical model is established and is solved by using the Newton iteration method.
首先基于节点方程法,建立了给水管网恒定流数学模型,并采用经改进的牛顿迭代法实现了对模型的求解;其次由特征线法建立了给水管网瞬变流数学模型,可预测管网运行中出现的有害水击,并求得可能出现的最大(最小)水压及其相应发生的位置。
2.
Based on the characteristics of the daily regulation wave of hydropower stations, the water surface lines in the rising and falling stages are calculated by using an one-dimensional steady flow model and an unsteady flow sediment model.
根据水电站日调节波的特性,运用一维恒定流和非恒定流泥沙数学模型,分别计算了河道涨落水过程的水面线。
3.
The problem of calculating steady flow in river network is converted to a nonlinear optimal problem.
将河网恒定流水力计算转化为非线性优化问题,并利用实数编码的遗传算法进行求解,可实现误差的总体控制,有利于计算精度的提高。
2)  constant flow
恒定流
1.
Based on the grids, the paper sets up the mathematical models of 1D constant flow, 1D inconstant flow and 2D inconstant flow, according to St .
3对西江广东段河道地形图进行了数字化并生成了河道贴体网格,在此基础上根据圣维南方程组建立了一维恒定流模型、一维非恒定流模型及二维非恒定流数学模型;根据西江的特点,针对有机物和重金属分别建立了一维水质模型和二维水质模型,并将水量模型和水质耦合起来进行水质的预警预报。
3)  unsteady flow
非恒定流
1.
Numerical modeling of vertical 2D unsteady flow and suspended material distribution;
垂向二维非恒定流及悬浮物分布模型研究
2.
Study on the influences of daily regulation unsteady flow in hydroelectric project to mooring force;
电站日调节非恒定流对系缆力的影响研究
3.
Numerical simulation of unsteady flow in Xiangjiaba Hydropower Project;
向家坝水利枢纽下泄非恒定流的数值模拟
4)  flux-constant
流量恒定
1.
Under the severe demand of the Water/Metal Fuel Motor on the flux of water in the starting period,a new type of pressure-adaptive and flux-constant orifice was brought forward.
理论分析此喷嘴的流量自适应保持原理,通过流量特性实验验证此喷嘴能够自动调节流阻,实现流量恒定。
5)  Constant flow
恒定流量
6)  transient flow
非恒定流
1.
According to perturbation method in hydrodynamics,the differential equations including continuity equation and movement equation of transient flow in open channel are transformed into polynomials.
本文从明渠非恒定流的连续性方程和运动方程出发,用流体力学摄动法将方程展开成多项式,取其零阶和一阶进行线性化,并认为零阶为水位未摄动时的值,最后利用分离变量法,并认为其下降过程呈指数形式,得出滑坡失事点的涌浪的衰减规律,并据此进行涌浪高度的叠加。
2.
But its transient flow problem hasn t been well resolved.
大底坡明渠是常见的水工建筑物 ,其非恒定流计算一直未能得到很好的解决。
3.
Based on the differential equations of the transient flow in conduit under pressure and combined with the specific boundary condition of Wanniuba Water Power Station,a numerical model is constituted with characteristic method,which is used to simulate the transients of sudden load rejection in water power stations.
以有压管道非恒定流微分方程组为基础 ,结合碗牛坝水电站具体边界条件 ,建立了基于特征线法的描述水电站突甩负荷过渡过程的数值模型 ,全面细致地模拟出了该电站突甩负荷过渡过程中任一时刻压力管道任一断面各水力要素和机组各工况参数的瞬变规律 ,为该电站的设计及安全稳定运行提供了技术依据 ,对类似工程也有一定的参考价值。
补充资料:明渠非恒定流
      流速、水位等随时间变化的明渠水流。它是由于某处流量、水位等随时间变化而引起的,例如河流中的洪水过程以及由于泄水建筑物闸门调节引起的渠道水流变动等(见图)。图中原恒定流时的水面为实线。设想把闸门向上迅速提起,紧靠闸门的上游水体立即由闸孔泄出,流量增加,水位下降。相反,闸门下游水位升高。虚线表示了闸门上提后各瞬时的水面。由图可见,明渠非恒定流通常表现为波,即水面壅高或降低从一处传向别处的现象。其中起决定作用的力是重力,所以称为重力波。这种波不但有波形的推进,而且伴随着水质量的输运,这是它与湖泊海洋中的波浪的根本区别。
  
  
  一维非恒定流的水力要素如流速v、流量Q、水位z(水深h)、过水面积A等均为时间t和距离s的函数:Q=Q(s,t)、A=A(s,t)、v=v(s,t)、z=z(s,t)或h=h(s,t)。根据质量守恒和动量原理可以导出这些函数所满足的微分方程,即1871年法国人A.J.C.B.de圣维南提出的圣维南方程组,它包括水流连续性方程及运动方程:
  
  连续性方程
  
  
  运动方程
  
  
  对于矩形断面明渠,上式可化为:
  
  
  式中;C为谢才系数;R为水力半径;i为底坡;g为重力加速度。K、C、R均为z或h的函数。(见谢才公式)
  
  圣维南方程组属于一阶双曲型拟线性偏微分方程组。结合初始条件和边界条件联解该方程组便可求得未知函数Q、A或v与h,但目前尚无普遍积分解。实践中常采用近似的计算方法,如特征线法、直接差分法、瞬态法、有限单元法等。应用电子数字计算机求数值解近年来发展迅速。这使明渠非恒定流理论广泛地用于防洪、灌溉、航运、发电、海涂围垦及环境保护等各项工程。其研究对象包括天然河流、人工渠道、河网、水库、湖泊、潮汐河口、港湾及城市下水道系统等 。
  
  

参考书目
   K.麦赫默德、V.叶夫耶维奇编,林秉南等译:《明渠不恒定流》,第 1卷,水利电力出版社,北京,1987。(K.Mahmood andV.Yevjevich, Unsteady Flow in Open Channels,Vol.1,Water Resources Publications,FortCollins,Colorado,1975.)
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条