For the upcoming system scenarios, it is necessary to forecast the short-term reliability level, which is crucial for cascading failure research in the power system.
提出一种基于双重方差减少技术(dual variance reduction,DVR)的模拟方法,该方法综合控制变量和Dagger抽样对电力系统进行短期可靠性评估。
2.
In the short-term reliability evaluation,the steady-state unavailability may yield remarkable error due to the time-dependency of the state probabilities.
电力系统短期可靠性评估中,设备状态概率和不可用率随时间变化较大,采用稳态不可用率抽样随机故障,可能引起较大误差。
3.
A condition dependent short-term reliability model of transmission equipment is presented,which is a combination of three segments:temperature dependent aging failure model,weather dependent chance failure model and current dependent overload protection model.
输变电设备中长期规划可靠性预测中,变压器和输电线路的可靠性模型常采用恒定的稳态不可用率,然而由于设备的短期停运概率与预测时间和运行条件相关,这种模型并不适用于设备的短期可靠性预测。
3)  running reliability
运行可靠性
1.
Running of power grid is up against increasing risk, analysis of power grid running reliability is a key task to the safety of power grid.
电网运行可靠性的分析是关系电网安全运行的关键课题。
2.
Results of running reliability analysis are used to guide determining life of condition inspection of drilling pump;The method of reliability analysis is used in the study that parameters of feature condition;to study reliability of that system of condition inspection and fault diagnose.
采用运行可靠性分析的结果来指导钻井泵状态监测与故障周期的确定;对状态特征参数进行采集跟踪并作可靠性分析,以提高故障诊断及剩余工作寿命预测的准确率;并应用这一方法研究了3NB-1300钻井泵的运行可靠性,得到了较好的预测结果。
3.
Running of power grid is up against increasing risk, analysis of power grid running reliability is a key task to the safety of power grid.
电网运行可靠性的分析是关系电网安全运行的关键课题。
4)  operation reliability
运行可靠性
1.
Operation reliability research for main mechanical equipment in hydroelectric power plant;
水电厂机械主设备运行可靠性研究
2.
In the light of the existing connection methods and protection configuration of regional power network, this paper analyzes the operation reliability of substations with duplicate 220 kV supply, line-transformer unit substations and substations with power supply from the receiving-end system in 110 kV power network under different operation and failure modes.
针对现有地区电网的接线方式和保护配置,比较全面地分析了110kV双电源变电站、线路-变压器组变电站、有电源上网的变电站在不同运行方式及故障方式下的运行可靠性,对运行实践中出现的问题,提出了采用备用电源自动投入装置、自动重合闸装置及合理设定保护定值等方法来解决的方案,该方案在惠州电网变电站运行的实践中得到验证。
3.
Bring simple countermeasure to improve operation reliability.
本文对运行可靠性进行初步的探讨,从实际电网运行的状况中,寻找运行可靠性评估的条件与方法,提出自身的一些见解。
5)  operational reliability
运行可靠性
1.
Evaluation of operational reliability for DC converter stations by using variation coefficient method;
用变异系数法评价直流换流站的运行可靠性
2.
By use of the concept of operational reliability and evaluation theory, a component’s reliability model based on real-time operating condition is built, in which the impacts of units’ operating mode, real-time fluctuation of power load and variation of power network structure on operational reliability are comprehensively considered.
运行可靠性概念和评估理论建立了基于实时运行条件的元件可靠性模型,综合考虑了机组的运行方式、负荷的实时变化、网络结构的变化等实时运行条件对运行可靠性的影响。
3.
All factors that affect operational reliability of thyristor DC switch from four aspec.
对EAST托卡马克极向场电源系统的关键设备之一——大功率直流快速晶闸管开关设计进行了详细介绍,如主电路方案设计、换流回路优化设计、保护电路设计、充电机设计等;从提高晶闸管开关运行可靠性(包括关断可靠性、开通可靠性、通态和断态可靠性等)的角度结合仿真分析了各设计要点的必要性,并提出了进一步改进的措施。
6)  Operating reliability
运行可靠性
1.
This paper compares the reliability evaluation methods of the electric power network in existence,from the operating reliability point of view,advances a applied real-time reliability evaluation project for the operating condition of electric power network,then analyzes the process and mathematic model of the reliability evaluation in detail.
对现有电网可靠性评估方法进行比较,从运行可靠性的角度,提出了实时电网运行状态可靠性评估的实用方案,对评估的流程和数学模型做了较详细的分析。
补充资料:《北美互联系统运行可靠性准则》


《北美互联系统运行可靠性准则》
Reliability Criteria for Interconnected Sys-tem Operation in North America

  析报告;⑦检修和维修工作时的协调配合. 互联系统紧急状态时的处理包括以下紧急状态的处理基本原则:①发电容t不足;②翰电设施过负荷和电压控制;③减负荷;④事故后系统的恢复;⑤紧急运行状态下信息的交换;⑥特殊措施,如发生危及联合系统可靠性时各电力系统和控制区的处理原则以及联合系统解列后被解列系统应采取的措施等,⑦控制中心失灵时的后备措施等。 对互联系统运行值班人员的有关规定包括:①责任和权力;②人员的选择;③人员的培训,④系统运行值班人员的其他贵任。 互联系统的运行计划包括的基本原则有:①正常运行方式的计划,②事故情况下的运行计划;③处理电t及电力不足时的步骤;④减负荷计划;⑤系统恢复步骤。 互联系统的通信包括的落本原则有:①通信设施;②运行人员之间的通信程序,③通信中断时保持系统继续运行的措施。 《北美互联系统运行可靠性准则》是由北美电力可靠性协会制定的为保证互联电力系统(包括各成员系统)安全稳定运行的最低可布性准则。互联系统中的各成员电力系统和控制区都应自觉地遵守该准则的各项荃本原则和规定,共同保证互联电力系统(包括各成员系统)的安全稳定运行。该准则的内容对电力系统的互联运行有参考价值。Be一mel HullonX{tong Yunx一ng Kekoox一ng Zhunze《北典互联系统运行可命性准则》(尺召止妇她.yC碗er匆了b犷Interc胡解ted System OPerat加inN侧嘴hA书性日八ca)北美电力可靠性协会(NorthAmerican Eleetrie Reliability Couneil)运行委员会(o perating Committee)为促进互联电力系统运行的协调、提高其可靠性以及实现有效、连续的高水平控制而制定的墓本运行原则。准则是根据现有的技术理论和成熟的运行经脸制定的,是最低的运行要求。 批准单位和时间原由北美电力系统互联委员会于1970年4月公布,1973年进行了第一次修订.1980年经NERC(National Eleetric Reliability Couneil)批准作为NERC的准则.1985年又进行T修订并由NERC(North Ameriean Eleetrie Reliability Couneil)于1985年12月批准颁发。 主共内容包括互联电力系统的控制,互联电力系统的安全性,互联系统紧急状态时的处理,对互联系统运行值班人员的有关规定,互联系统的运行计划,互联系统的通信等。 互联电力系统的控制所规定的基本运行原则为:①互联系统的有功功率调整;②电压控制;③时间和频率的调整;④电力交换计划;⑤控制性能准则,⑥非计划交换电力的管理;⑦控制性能的定期检查;⑧对控制设备的要求等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条