说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 尼尔基水利枢纽
1)  Nierji water complex
尼尔基水利枢纽
1.
Analysis of Nierji water complex influence to downstream drought regime in 2007;
2007年尼尔基水利枢纽对下游旱情影响分析
2.
Study on hydrological forecast in construction of Nierji water complex;
尼尔基水利枢纽施工期预报研究
3.
Second-stage river diversion and river closure construction in Nierji water complex;
尼尔基水利枢纽工程二期导截流施工
2)  Ni erji water conservancy project
尼尔基水利枢纽
1.
The concrctc production tcchniquc mcasurcs in the Ni erji water conservancy project in the low temperature serson;
尼尔基水利枢纽工程低温季节混凝土生产措施
2.
Arrangement and design optimization of the power house of Ni erji water conservancy project;
尼尔基水利枢纽工程厂房布置及优化
3.
The environment protection and conservation of water and soil in Ni erji water conservancy project;
尼尔基水利枢纽工程环境保护及水土保持概述
3)  Nierji Hydraulic Project
尼尔基水利枢纽
1.
In order to solve the problem of anti-abrasion and anti-seepage of concrete scroll case in Nierji Hydraulic Project,the technology is applied into this project.
为了解决尼尔基水利枢纽工程混凝土蜗壳防渗及抗冲磨问题,首次大规模应用了喷涂聚脲弹性体技术。
2.
This paper reports the hydrology examination work for Nierji hydraulic project river closure in 2001 in winter.
报道 2 0 0 1年冬季为尼尔基水利枢纽截流而进行的水文测验工
3.
The main purposes of Nierji Hydraulic Project is flood control so as to supply water for living and industry,as well as agriculture and power generation,while considerations on improving the shipping condition and water environment are needed.
尼尔基水利枢纽工程以防洪、城镇生活和工农业供水为主,结合发电,兼顾改善下游航运和水环境,并为松辽流域水资源的优化配置创造条件的大型控制性工程。
4)  Ni erji water conservancy project
尼尔基水利枢纽工程
1.
CAT fiber was added in the construction of hydraulic turbine concrete of snails shelly in powerhouse of Ni erji water conservancy project in order to improve the performance of split-resisting,imperviousness,anti-impulse and wear-resisting.
为了提高发电厂房水轮机混凝土蜗壳的抗裂、抗渗、抗冲击、抗震、抗冲耐磨性能,在尼尔基水利枢纽工程蜗壳混凝土的施工中掺加抗裂合成纤维,厂房项目部试验人员对蜗壳混凝土进行了掺加抗裂合成纤维(CTAFiber)试验,试验结果及工程实际应用效果良好,提高了工程质量,支持了国家重点工程建设。
2.
Ni erji water conservancy project as an important project constructed by the state is strictly managed according to the law of tender and bid and the correlational policy and statute.
尼尔基水利枢纽工程作为国家重点建设项目,严格按照招标投标法及相关的政策法规进行招标管理。
5)  hydraulic complex
水利枢纽
1.
Closure gate design for diversion tunnel of Xiaorongjiang Hydraulic Complex;
小溶江水利枢纽导流洞封堵闸门设计
2.
Sanzuodian hydraulic complex locates at the downstream of the influent Yen river of Xiliao river in Chifeng city, Inner Mongolia, which is the key project for flood control and water supply for the city in the basin plan of Songhua river and Liao river, which main task is to improve the flood control and water supply standard where locates at the distance 35Km from hydraulic complex.
 三座店水利枢纽工程位于内蒙古赤峰市境内西辽河支流阴河下游,是列入松花江和辽河流域规划和赤峰市城市防洪供水规划的重点骨干工程,主要任务是提高位于枢纽下游35km处的赤峰市的防洪标准以及向赤峰市供水。
6)  hydro-junction
水利枢纽
1.
Study on coupling of 3D visualization with numerical simulation for powerhouse excavation of a certain hydro-junction;
某水利枢纽厂房开挖三维可视化与数值模拟耦合研究
2.
Discussion on seepage prevention of deep overburden layer ofXiabandi hydro-junction in Xinjiang;
新疆下坂地水利枢纽工程深覆盖层防渗问题探讨
3.
Video monitoring system has been widely applied in safe production monitoring for hydro-junction, and gradually developed from traditional security monitoring to management monitoring.
视频监控系统在水利枢纽的安全生产监控中应用非常普遍,并逐步由传统的安防监控向管理监控发展,进行模拟系统的网络化、数字化改造将是必然趋势。
补充资料:乌尼基尔
药物名称:乌尼基尔

英文名:Sodium Dimercaptosulphonate

别名: 二巯丙磺钠;二巯基丙醇磺酸钠;解砷灵 ,二巯丙磺酸钠
外文名:Unithiol , Sodium Dimercaptosulphonate
适应症: 对汞中毒效力较二巯基丙醇好,毒性则较低。对砷、铬、铋、铜、锑等中毒亦有效。
用量用法:
1.治疗急性中毒:静注1次每千克体重5mg,每4~5小时1次。第2日起每日2~3次,以后每日1~2次。7日为1疗程。 2.治疗慢性中毒:1次每千克体重2.5~5mg,每日1次,用药3日停4日为1疗程,一般3~5疗程。
注意事项:
可有恶心、心动过速、头晕等,不久可消失。个别有过敏反应如皮疹、寒战、发热,甚至有过敏性休克、剥脱性皮炎。
规格: 注射液:0.25g(5ml)。


类别:解毒药
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条