说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工对策
1)  construction countermeasure
施工对策
1.
Major geological questions of Daluliangzi tunnel and construction countermeasures;
大路梁子隧道主要地质问题及施工对策
2.
As a conclusion,construction countermeasures were also brought forward for structures of high-pressure water.
文中介绍了几种典型高压涌水形成的地质条件,为了防止在隧洞掘进过程中出现突发性高压涌水,采用宏观地质预报、微观地质预报及探地雷达预报提前预测可能存在高压涌水的位置、水量和水压等,并且对一些富含高压水构造提出了一些相应的施工对策
2)  construction treating countermeasures
施工处理对策
3)  Safety measuros of construction
安全施工对策
4)  measure [英]['meʒə(r)]  [美]['mɛʒɚ]
对策措施
1.
According to the water quality requirement of Level Ⅲ,some treatment measures are put forward.
根据东线工程输水全线水质达到国家地表水环境质量Ⅲ类标准的要求,提出保证水质的防治与保障对策措施。
2.
The leakage causes of cooler of CO_2 compressor in the CO_2 stripped urea plant was analyzed,and relative measures were given in this article.
介绍了二氧化碳汽提法尿素装置的二氧化碳压缩机三段冷却分离器的运行情况,分析了泄漏原因并得出结论———应力腐蚀,提出对策措施。
3.
We should have a good understanding of the key factors and problems in our social work in the minority areas before we can take corresponding measures to improve our work and stabilize and develop the minority areas.
只有认清目前我国社会工作中的薄弱环节、民族地区社会工作中的关健问题、影响因素等,采取相应的对策措施,才能促进社会工作在民族地区的顺利开展,促进民族地区的发展和社会稳定。
5)  measures [英]['meʒə]  [美]['mɛʒɚ]
对策措施
1.
Problems of scouring and erosion on water cushion basin in Manwan hydropower station and its measures;
漫湾水电站水垫塘冲蚀磨损问题及对策措施
2.
This paper analyzes the value and effectiveness of construction safety management, studies deeply and puts forward measures of construction safety management and safety technology so that construction enterprises can reduce safety accidents, improve the productivity and increase the economic benefit.
本文对建筑施工安全价值及效益进行了分析,深入研究并提出了建筑施工安全管理和安全技术的对策措施,以期降低建筑安全事故率,提高建筑业生产力,提高经济效益。
3.
This paper aims to analyze the problems in our policy supervision system and to put forward some measures to improve the system,which will enable the supervision function to be fully fulfilled.
针对目前我国政策监控存在的问题,应完善我国政策监控系统的对策措施,使政策监控职能得以充分发挥。
6)  countermeasures
对策措施
1.
The Two Strong Earthquakes of Ming Dynasty in Xichang (Sichuan) and Its Post Earthquake Countermeasures;
明代四川西昌两次强震及震后对策措施
2.
Study on hidden danger analysis and countermeasures of urban villages in Xi'an
西安市城中村事故隐患分析及对策措施研究
3.
The danger and countermeasures in procedure were pointed out through investigating and surveying the domestic production plant of dissolved acetylene.
通过对国内现有溶解乙炔生产装置进行调研,同时结合国内外其他涉及溶解生产厂家的具体情况,分析并指出生产过程中可能出现的危险有害因素,并提出相应的对策措施,为企业消除事故隐患和搞好安全生产提供参考。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条