2) project's key points and hard nuts
工程重难点
3) the difficulties of programming
编程难点
6) construction difficulties
施工难点
1.
Based on the geological condition,surrounding environment and engineering characteristics of the river-crossing tunnel along the South Tibet Road in Shanghai,this paper analyzes the construction difficulties and potential risks,which involve many factors:complicated geological conditions,variable soil thickness,crossing of the Huangpu River and metro M8,the curved excavations.
基于上海市西藏南路越江隧道工程的地质条件、周边环境和工程特点,对该隧道的施工难点和可能存在的风险进行分析,发现主要存在地层复杂、覆土厚度变化大、穿越黄浦江和已运营隧道等难点。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条