说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洞塞式消能工
1)  plug energy dissipater
洞塞式消能工
1.
Numerical simulation of plug energy dissipater flow;
洞塞式消能工的数值模拟
2)  plug dissipator
洞塞消能工
1.
The calculated result shows that the combined energy dissipator can greatly improve the minimum pressure in plugs and cavitation number of water flow as compared with the single plug dissipator, and the efficiency .
为了提高洞塞内的最小压强,扩大洞塞式消能工的应用范围,提出了一种新型的内流式消能工———组合式洞塞消能工,并用k ε模型计算了组合式洞塞消能工的水力参数。
3)  cavern energy dissipator
洞内消能工
4)  orifice(plug) energy dissipassion
孔板(洞塞)消能
1.
This paper summarizes some research results concerning orifice(plug) energy dissipassion,it also points out some areas needed to be further studied as regards the orifice(plug) dissipator.
孔板(洞塞)消能具有消能效率高和空化数大等优点。
5)  energy dissipation in tunnel
洞内消能
1.
Along with the development of the long tunnel diversion works with cutting across,the research of energy dissipation in tunnel is also further deepen.
随着跨流域长隧洞引水工程的发展,洞内消能的研究也在进一步深化,南水北调西线一期工程中的阿安引水隧洞采用洞内消能工程。
6)  plug discharge
洞塞式泄洪
1.
In the case of plug discharge,the characteristic of turbulence was studied firstly,then 3-D RNGκ-εmathematical model was established and verified properly by physical model test data.
针对洞塞式泄洪的特征,分析了水流紊动特点,建立了三维RNGκ-ε紊流模型,并利用物理模型试验对其计算结果进行了验证;对洞塞式泄洪沿程的最小压强系数进行了计算,分析结果表明,最小压强系数沿程在洞塞突缩端和突扩端附近呈现明显的双峰分布。
补充资料:消能工
消能工
enengy dissipator

    消除泄水建筑物下泄急流的多余动能,保证建筑物安全和正常运行的工程设施。多余动能系指建筑物上游水流动能与下游正常水流动能之差。多余动能是通过水流内部的紊动、掺混、剪切及旋滚,水股的扩散和水股之间的碰撞,水流与固体边界的摩擦与撞击及水流与周围气体的摩擦与掺混等  ,转换成热能而逸散掉。常用的消能工有:①通过水跃消除多余动能的水跃消能工,又称底流消能工。②利用泄水建筑物出口的挑流鼻坎将下泄急流抛向空中,然后落入下游河床水垫中来消除多余动能的挑流消能工。③利用泄水建筑物出口的鼻坎将下泄急流的主流挑至水面,通过主流在表面扩散及底部旋滚和表面旋滚来消除多余动能的面流消能工。此外  ,还有为提高消能效率,用于较低流速情况下的辅助消能工以及超空穴消能工、压力消能工、自由跌落式消能工等。消能工的选型与建筑物的形式、枢纽布置、上下游水位、地形  、地质、运用要求等因素有关,对大中型和重要工程,还要进行水力模型试验。为了保证建筑物及枢纽正常运行,要求做到消能工本身不受空蚀(物体受到气体空泡流冲击后表面出现的变形和材料剥蚀现象)、磨蚀等损伤,下游岸坡稳定  ,河床不出现危害性冲刷。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条