1) breakwater construction
防波堤施工
2) breakwater
防波堤
1.
Response of tidal dynamics to a breakwater construction for fishing port in muti-island waters;
海岛渔港防波堤建设的潮动力响应
2.
Optimization Of Pitch-Straight Vertical Breakwater Wharf;
斜坡-直立式防波堤码头施工组织
3.
Application of numerical flume in pre-design of breakwater;
数字波浪槽在防波堤预设计中的应用
3) breakwaters
防波堤
4) east breakwater
东防波堤
1.
It is introduced that after completion of construction of Beihai Fishery Base Port, there appeared siltation at the inner side of the east breakwater, the cause of which is analyzed.
文章介绍北海渔业基地港建成后,在东防波堤内侧发生泥沙淤积,并分析其原因。
5) torpedo tube shutter
防波板
6) surge box
防波动盒
参考词条
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。