说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 测压管
1)  piezometer [英][,paiə'zɔmitə]  [美][,paɪə'zɑmətɚ]
测压管
1.
This paper gives a presentation of the leakage situation of both foundation and abutments of the Songhua dam based on piezometer observation data and puts forward study conclusions and proposals.
根据松华坝水库大坝的测压管观测资料,分析了主坝坝基及坝肩渗漏情况,认为大坝防渗工程大多完好,右岸存在一定程度的绕坝渗漏,建议在进一步查明渗漏的基础上,对其进行防渗处理。
2.
This paper briefed the structure and construction of piezometers in earth_rock dam and discussed common problems in monitoring piezometric level.
简要介绍了土石坝测压管的结构、施工 ,讨论了土石坝测压管水位监测的常见问题 ,并提出了一些简单的处理方法 ,可供设计单位、水库管理单位参
3.
According to seepage analysis and study of the piezometer data of Dingzhuang dam before and after high pressure grouting anti seepage,this paper puts forward the analytic method of the piezometer data,which is the method of water level distribution curve of the piezometer data applied to qualitative and quantitative analysis.
本文通过对丁庄水库大坝采用高喷灌浆防渗加固前后测压管实测资料的分析研究 ,提出了一种测压管实测资料分析方法——测压管水位分布曲线法 ,对观测资料作定性和定量分析。
2)  piezometric tube
测压管
1.
Automation transformation of 100-m piezometric tube of Shisanling Pumped-storage Power Plant;
十三陵蓄能电厂百米测压管的自动化改造
2.
This paper introduces the structure and the observation principle of piezometric tubes,and probes into several problem s in design,construction,and management.
介绍了测压管的构造和观测原理 ,对其设计、施工及管理中的一些问题进行了探讨 ,并详细分析了测压管滞后的原因 ,最后提出了一些建议。
3.
There have been occurred sludge plugging in piezometric tube after several years operation,resulting in less water level change.
水电厂各测压管运行多年后,大都会出现淤堵情况,从而造成管内水位变化逐渐偏小,灵敏度降低,影响对水工建筑的安全监测。
3)  piezometer tube
测压管
1.
The highest piezometric level of piezometer tubes W31 and W61 at the base of Hualiangting Reservoir exceeded that of tubes W121 and W71 by 8.
2003年花凉亭水库坝基测压管W31和W61最高管水位比邻近的W121和W71分别高出8。
2.
Piezometer tubes are the eyes of reservoirs、dams、and other hydraulic enginerring constructions,in order to observe the law of developments in groundwater level,water temperture,water quality etc.
测压管——水库及大坝等水工建筑物的眼睛,用以观测地下水位、水温、水质等的动态变化规律。
4)  manometer tube
测压管
5)  piezometer pipe
测压管
1.
The earth dam piezometer pipe burial in Xiquanyan Reservoir;
西泉眼水库土坝测压管埋设
2.
Application of dam piezometer pipe data analysis in seepage safety assessment of Beixingjia reservoir;
大坝测压管观测资料分析在北邢家水库渗流安全评价中的应用
6)  standpipe [英]['stændpaɪp]  [美]['stænd'paɪp]
测压管
1.
Study of time lag problem of piezometric level observations using open standpipes;
敞开型测压管水位监测的滞后时间问题研究
补充资料:冲击波超压与动压

[解释]:  核爆炸产生的高温、高压火球膨胀,在周围介质中形成连续向外传播的压力脉冲(或冲击波),冲击波阵面传播到空间某点时,超过周围环境大器的压力称超压;空气粒子高速随波阵面运动产生的冲击压力称动压。超压和动压都以帕斯卡(Pa)为主单位。超压随时间的变化取决于爆炸威力、距爆点的距离和爆心周围的介质情况。特定地点的峰值超压一般出现在冲击波阵面到达该点的瞬间,超压在该点的持续时间称为正压作用时间。尔后,该点的压力下降到低于周围压力,称为负压,再逐渐回升到周围压力值。对人员的直接冲击伤,超压为20—29千帕可引器轻度伤;29—59千帕可导致中度伤;59—98千帕可造成重度伤;大于98千帕可造成极重度伤。动压为10—20千帕可造成中度伤;20—39千帕可造成重度伤;大于39千帕可造成极重度伤。动压的推动、抛掷和超压的挤压会造成物体变形和毁坏。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条