1) Virtual Enterprise of Construction Project
建设项目动态联盟
1.
We use factor analysis method to evaluate partner building safety in the setting of virtual enterprise of construction project.
应用因子分析法对建设项目动态联盟背景下的伙伴施工安全进行评价。
2.
Then, it analyzes the system structure and power distribution from the three parts for gover -nance structure of virtual enterprise of construction project in order to benefit the virtual enterprise.
通过对建设项目动态联盟中多层委托代理关系的分析,提出了建设项目动态联盟治理结构的概念,对联盟中不同的利益主体间的权、责、利关系进行界定。
3.
According to the theory of factor analysis,we propose a model of factor analysis to measure the partner ability of virtual enterprise of construction project.
应用因子分析法对建设项目动态联盟的伙伴能力进行分析,通过问卷调查获取的数据提取出4个公因子:资源能力因子、合作能力因子、敏捷性能力因子和技术能力因子。
2) Virtual Enterprise Project Management(VEPM)
动态联盟项目管理
3) dynamic alliance of engineering project
工程项目动态联盟
5) equipment virtual enterprises
设备动态联盟
1.
Application of equipment virtual enterprises provides a new ideal for optimizing and combining unused equipments resource of the corporations.
为此,着重阐述了实施设备动态联盟的几个要素、过程以及应注意的几个问题,为调动各个企业的闲置设备资源重新优化组合提供了一条崭新的思路,为建立设备动态联盟提供了一定的理论基础。
6) dynamic design alliance
动态设计联盟
补充资料:报批建设项目用地
报批建设项目用地
【报批建设项目用地】在审批建设项目用地过程中,按征用土地审批权限规定,需报_L级人民政府进行审查批复的活动。土地管理部门报批建设项目用地,除用地单位正式申报建设用地时按土地审批权限抄报给上级土地管理部门有关附件外,还应向同级人民政府或t级土地管理部门加送以下附件:1.土地管理部门对建设用地的审查意见;2.建设用地征求意见书或有关部门证明材料;3.对建址在城市规划区内的项目,应附城市规划管理部门的审查意见;4.建设项征目拨用地呈报表;5.征〔拨)用地的补偿安置方案和征地费用包干协议,并附征地费用计算依据。需报国务院批准的建设用地,由省级人民政府行文上报。报告、文件按国务院规定份数报送;附件一式三份,其中报国务院一份,抄送国家土地管理局一份,建设项目的国家主管部门一份。建址在城市规划区内的项目,另抄送建设部一份。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条