1)  speedometer
车速计
1.
The non-contact vehicle speedometer is applied to the checkable meter of vehicle speedometer.
针对非接触式车速计有关精度的技术要求,分析了实现非接触式车速计的校验方法。
2)  vehicle speed calculating
车速计算
3)  vehicle speed
车速
1.
Effects of Road Gradient and Vehicle Speed on Smoke Emission in Highway Tunnel;
隧道内路面坡度和车速对车辆烟雾排放量影响的研究
2.
Effect of vehicle speed and roadway surface condition on the random dynamic loads of the wheels;
车轮随机动载与路面及车速相互关系的研究
3.
According to the shop drawing and spot statistical data of Xihan expressway,this paper forecasts the vehicle speed of the sections of the expressway and assesses the safety probability on the traffic engineering facil.
针对道路在建成之前很难进行有效的安全保障设施设计,依托于在建西汉高速公路秦岭北麓路段施工图和现场勘查资料,采用驾驶人速度控制模式模拟计算系统软件预测研究路段的运行车速,同时在虚拟仿真的基础上对道路、隧道、桥梁的交通工程设施、照明等系统进行安全性评价,从而发现西汉高速设计过程中存在的行车安全性问题。
4)  velocity
车速
1.
Based on traffic conflict technique and the videotaping of 9 uncontrolled pedestrian crosswalk,this paper establishes the severity index of pedestrian-vehicle conflict by identifying the vehicle velocity,vehicle track change and pedestrian s risk-avoiding behavior.
通过读取冲突过程中的车速变化过程、车辆运行轨迹变化过程和行人的避险行为,建立了行人-车辆冲突严重程度的辨别指标,对人车冲突过程中行人以及车辆的避险特性进行了定量的总结和分析。
2.
The results indicate that the existing method adjusting asphalt pump rev to fit the changeable velocity of the equipment,will change the work status of components in the spray system frequently,it is not good for improving the asphalt distributing quality.
为了提高同步碎石封层设备的沥青洒布质量,在研究了同步碎石封层设备以及沥青泵和沥青喷嘴等主要元件工作特性的基础上,指出现有的调节沥青泵转速为适应车速变化、保持沥青洒布量恒定的做法,会引起沥青喷洒系统元件工作点的频繁变换,不利于沥青洒布精度的提高。
3.
Based on driving test and comparing to the day driving condition,this paper search for the varying feature of driving between velocity and driver heart rate in the straight-line section,velocity and radius in the curve section on the freeway in the night.
以行车试验为基础,通过与白天行车状况的比较,探索夜间在高速公路行车时,在直线路段上车速与驾驶员心率之间的变化特点以及在平曲线路段上车速与半径之间的变化特点。
5)  speed
车速
1.
The design of calculations of production capacity and speed for fourdrinier machine based on VB;
基于VB的长网纸机产能及车速计算的程序设计
2.
Freeway alignment evaluation based on operation speed;
基于运行车速的高速公路线形安全性评价
6)  train speed
车速
1.
CO was influenced by the train speed.
车速对 NOx 影响不明显 ,而对 CO的影响较大 ,由于风向的变化 ,使隧道内有害气体形成涡流或紊流 ,使 3测点出现多次高峰 ,由此可见 1、5测点有害气体峰值滞后 ,自然排净时间长于第 3测点。
参考词条
补充资料:车速
1.车行的速度。一般以每小时所行的公里数为表示方式。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。