说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 轨迹优化综合
1)  Track generation optimal synthesis
轨迹优化综合
2)  path synthesis
轨迹综合
1.
Application of screen imitating in the path synthesis of plane linkage mechanism;
屏幕拟合法在平面连杆机构离散点轨迹综合中的应用
2.
Research on Computer-Aided Creative Design Method Based on Planar Mechanism Path Synthesis;
平面机构轨迹综合及其计算机辅助创新设计方法研究
3.
A mechanism for performing path synthesis is designed to guide one point on a moving rigid body such that it passes through a specified sequence of points on a path.
轨迹综合机构是指能使连杆上某点沿着某一给定轨迹运动的平面连杆机构综合。
3)  Path generation
轨迹综合
1.
In this paper, the synthesis of path generation of the geared five bar mechanism is studied.
研究了齿轮五杆机构的再现轨迹综合问题。
2.
After that,based on the task of path generation for the path synthesis,the simulation mechanisms of accurate path generator with Geared five-bar mechanism are developed from the primary simulation mechanism.
本文用CAD的几何约束和尺寸驱动技术,在多个复合精确轨迹情况下构造一个基本五杆模拟机构,再根据轨迹综合的原则,由基本五杆模拟机构创造出精确轨迹综合模拟机构。
4)  trajectory optimization
轨迹优化
1.
Inspection robot control system of power transmission line based on production system and trajectory optimization;
基于产生式系统和轨迹优化的巡线机器人控制
2.
Survey of numerical methods for direct aircraft trajectory optimization
飞行器轨迹优化的直接数值解法综述
3.
This paper studies the kinematic simulation and trajectory optimization for the enclosed driving 2-DOF five-bar feeding mechanism of sewing machine.
对闭合传动的两自由度五杆缝纫机送料机构进行了动态仿真和轨迹优化研究。
5)  optimize track
优化轨迹
1.
In practices engineering, it is mainly relying on the operators experiences to ensure the position of the making lean point and to design the whole optimize track.
在工程实践中,主要是依据设计人员的经验来确定造斜点位置,从而确定整个优化轨迹。
6)  well-track optimization
井轨迹优化
补充资料:施工综合进度优化


施工综合进度优化
optimization for overall schedule of construction

shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条