说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 特高电压直流试验基地
1)  UHV DC test base station
特高电压直流试验基地
2)  UHV DC testing site
特高压直流试验基地
1.
The UHV DC testing site is the first testing site for experimental studies in key enabling technologies,environmental influences,insulation,radio interferences,etc.
特高压直流试验基地工程是为关键性技术、环境影响、绝缘特性、无线电干扰等方面提供试验研究的第1个特高压直流试验基地。
2.
Tower layout of test line and corona cages of the country s UHV DC testing site should meet functional requirements.
我国特高压直流试验基地试验线段和电晕笼的塔型布置应满足试验功能要求,共规划设计了7种基本塔型,9基铁塔。
3)  UHV AC Test Base
特高压交流试验基地
1.
Hoisting of 800 kV Wall-through Sleeve at UHV AC Test Base
特高压交流试验基地800kV穿墙套管的吊装
4)  UHVDC test line
特高压直流试验线段
1.
The main function of UHVDC test line was introduced, and the technic scenarios was put forward, including the length of test line, the configuration and function for the gantry tower, the anchor tower, the polarity-converting tower and the terminal tower, the selection and parameters for the size of draught conductor, jumping wire style, hardware, and insulator and other installations.
介绍了特高压直流试验线段的主要功能,提出了特高压直流试验线段的技术方案,主要包括试验线段长度、门型构架、锚塔、换极性塔和终端塔的结构型式和功能、引流线尺寸、跳线方式、金具、绝缘子以及主要设备的选型和参数。
5)  1000 kV UHV testing site
1000kV特高压试验基地
6)  UHV transmission tower test base
特高压杆塔试验基地
1.
Study on Test Management System of UHV Transmission Tower Test Base
特高压杆塔试验基地试验管理系统的研究
2.
Study on the Attachment Mode of Fixed Tower Crane at UHV Transmission Tower Test Base
特高压杆塔试验基地塔吊附着方式研究
3.
Study on Stress Measurement System of UHV Transmission Tower Test Base
特高压杆塔试验基地应变测量系统的研究
补充资料:冲击高电压测量(见高电压测量)


冲击高电压测量(见高电压测量)
measurement of high impulse voltages

  ch。门引才g。。dion丫日cel}o口g冲击高电压测量(rneasurement ofhighimpulsevoltages)见高电压测量。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条