说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 排桩
1)  row of piles
排桩
1.
Spatial mutual deformation analysis method for row of piles of deep excavation;
深基坑排桩支护结构空间共同变形分析
2.
Authors present a composite support style consisting of composite soil nail and row of piles uniting ring inner support.
通过某大剧院深基坑工程,提出了采用复合土钉+排桩圆环内支撑的复合型支护形式,阐述了软土地区为施工便利采用挖土平台的做法,总结了设计与施工密切配合的施工经验。
3.
Practice shows that the cooperative action between row of piles and ring beam has a certain influence on the deformation and internal forces of retaining piles.
实践表明,支护排桩与圈梁之间有较好的协同作用,圈梁的空间效应对支护桩的变形和内力均有一 定的影响。
2)  piles in row
排桩
1.
Based on the analysis of a certain retaining and protecting for deep foundation excavation,several structural schemes including piles in row,bracing system,soil nailing wall and diaphragm are compared.
结合深基坑支护实例,进行了排桩、内支撑、土钉墙、地下连续墙等多种支护方案的技术、经济比较,阐述了软土深基抗土钉墙支护结构的设计方法。
2.
According to the geology and terrain, two separate subsections of support were adopted: one is piles in row with grouting-bolts; the other is slope with shotcrete and wire mesh.
武汉某地下车库基坑处于深厚淤泥中 ,采用排桩 +土层锚杆支护与放坡 +网喷分段支护方式 ,本文根据现场地质、地形条件 ,对本工程支护过程中支护桩与土体变形作了具体分析。
3.
Based on the research of the mechanism of the top beam, the optimal design of piles in row is discussed.
本文针对深基坑排桩支护桩顶圈梁设计计算中存在的问题,以桩项圈梁的作用机理为主要研究内容,分别采用传统的结构力学矩阵计算方法和有限元分析软件对排桩—项圈梁支护体系内力进行计算和分析,对桩项圈梁作用的力学机理进行了深入的研究。
3)  pile row
排桩
1.
Taking the common action system of upper framed structure, pile raft foundation, subgrade and pile row supporting structure as a study object, the contributions of pile row structure to the upper structure and to the pile raft foundation are studied, the common action is analyzed by means of a 2 dimensional linear finite element m.
以上部框架结构—桩筏基础—地基—排桩支护结构共同作用体系为对象 ,研究排桩支护结构对上部结构和桩筏基础的作用 ,采用二维非线性有限单元法对其进行了共同作用分析 ,分别研究了不同相对弹性模量、不同相对刚度、不同支护桩长度等因素对该作用的影响 ,试图寻找一种通过调整某些因素就可在一定程度上控制支护结构作用的方
4)  row-pile
排桩
1.
Application of row-pile support in the design of foundation pit for Suzhou taxation building;
排桩支护在苏州税务大厦基坑设计中的应用
2.
Based on the mechanism analysis of frost-heaving force emerging in the retaining structure with row-piles and frozen soil wall for deep foundation pit,releasing-pressure holes are used to reduce horizontal frost-heaving force.
在分析深基坑排桩冻土墙围护结构的冻胀力产生机理的基础上,提出采用卸压孔法来减小水平冻胀力。
5)  soldier pile
排桩
1.
At present there were many problems in the design and application of Top-Beams as a result of inadequte study on the working mechanism and designing calculation method of top-beams in structure supported by soldier piles.
目前对排桩式支护结构中圈梁的作用机理和设计计算方法还缺乏充分研究,因而圈梁的设计与应用还存在着诸多问题。
6)  Pile [英][paɪl]  [美][paɪl]
排桩
1.
Piles and an internal bearing beam were applied in a 14 meters-deep pit with complex surroundings.
在深圳某周边条件复杂、且开挖深度达到14m的深基坑中,采用排桩+1道内支撑的支护体系,通过分析比较计算结果与监测数据,该支护形式达到了维持基坑安全稳定的目的,且有效控制了基坑周边沉降及位移,能给同行提供一定经验。