1) Zhengjiachong reservoir
郑家冲水库
1.
Dam safety appraisal for Zhengjiachong reservoir;
郑家冲水库大坝安全鉴定分析
2) Zhengjiawan hydropower station
郑家湾水电站
4) reservoir sediment washout
水库冲沙
5) the Panjiakou reservoir
潘家口水库
1.
Calculation of non-point source pollution loadings for the Panjiakou reservoir based on GIS;
基于GIS的潘家口水库面源污染负荷计算
2.
Areview on engineering geologicalissues for the Panjiakou Reservoir;
潘家口水库主要工程地质问题的再认识
3.
Study on the Simulation of the Non-Point Source Pollution in the Upstream Watershed of the Panjiakou Reservoir;
潘家口水库上游流域面源污染的模拟研究
6) Fengjiashan reservoir
冯家山水库
1.
Introduction on automatic management system at Fengjiashan reservoir;
冯家山水库自动化管理系统运行简介
2.
Application of automatic gate lifting control system in Fengjiashan reservoir;
闸门自动启闭控制系统在冯家山水库的建设与运用
3.
Analysis on Benefits about Water-saving Transformation Project in Fengjiashan Reservoir Irrigation Area;
冯家山水库灌区节水改造项目效益分析
补充资料:马家冲战斗
新四军豫鄂挺进纵队机关突破日伪军合围的战斗。1939年11月,由中国共产党领导的豫南、鄂中、鄂东抗日武装统一组成新四军豫鄂挺进纵队。12月5日,日伪军1500余人,兵分五路,并有飞机、大炮配合,前来围攻在湖北省京山县马家冲的纵队领导机关。豫鄂挺进纵队机关和随营学校、警卫分队仅200人,众寡悬殊。经终日抗击,毙伤敌70余人,当晚突出重围,安全转移。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条