1) head-span
软横跨
1.
After analysis of various plans for reconstruction of head-span of existing OCS under different construction conditions, it introduces the common reconstruction approaches that will be a reference for improving the construction efficiency and economic performance for similar projects in the future.
通过对既有线接触网软横跨改造时在不同施工条件下各种施工方案的分析,介绍了施工中常用的方法,为类似工程提高施工效率和经济效益提供了参考。
2.
The vertical headway is generally applied in replacement of head-span in double electrified railway lines, the paper proposes a new construction method for replacing the head-span in double electrified railway lines under vertical headway, with neutral section as a transition.
既有复线电气化铁道的软横跨一般利用垂直天窗点进行更换,本文提出了利用中性段过渡,在V型天窗点下更换既有复线软横跨的新的施工方法。
2) head-span suspension
软横跨
1.
In order to simplify the complex process of artificial calculation of head-span suspension,the design thought of the head-span suspension CAD system is put forward by taking modularity design idea as a guide,and taking VB programming language as the developing tool.
为简化软横跨人工计算的复杂过程,以模块化设计思想为指导,以VB编程语言为开发工具,提出了软横跨计算CAD系统的设计方案,实现了软横跨的计算和绘图一体化,可提高接触网工程施工效率。
3) head span suspension
软横跨
1.
The paper introduces the application of AutoLISP language for calculation of head span suspension during construction of OCS in electric railways,and develops the application of AutoCAD software for electric railways.
介绍使用AutoLISP编制接触网软横跨计算程序,发展了AutoCAD计算机软件在电气化铁道方面的应用。
2.
The paper discusses the application of AutoCAD soft ware for calculation of head span suspension during construction of OCS in electric railways, to make simplified programs and realize the calculation of head span suspension by built-in language of LISP of AutoCAD.
探讨AutoCAD计算机应用软件,应用于铁路电气化接触网施工中的软横跨计算,用AutoCAD内置LISP语言,编写简单易懂的程序,实现软横跨的计算。
4) head span
软横跨
1.
Suggestions on Improving the Suspension Mode of the Non-working Contact Line in the Contenary Suspension at the Point of Head Span;
改进软横跨处接触悬挂非工作支悬吊方式的建议
5) pendant type head span
悬吊式软横跨
1.
With reference of technology for reconstruction of multiple-track head span in Xinyue railway line, the paper summarizes the pendant type head span construction technology, construction methods adopted in OCS reconstruction of Yueshan railway junction as well as the key precautions.
本文根据新月线接触网改造工程的多股道软横跨改造的施工经验,总结了月山枢纽接触网改造采用的悬吊式软横跨施工技术、施工方法及注意要点。
6) head span OCS
软横跨接触悬挂
1.
The paper analyzes main technical characteristics of this new-type head span OCS, and the construction technique are studied, a viable improvement scheme is offered.
本文分析了新型软横跨接触悬挂的主要技术特点,对施工技术进行了研究并提出了可行的改进方案。