说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 高薄拱坝
1)  high and thin arch dam
高薄拱坝
1.
A series of generalized stability analysis models of high and thin arch dams were established,and the stability overload coefficients were calculated with the buckling analysis function of ANSYS based on FEM.
建立了高薄拱坝坝身稳定分析的系列概化模型,采用通用有限元软件ANSYS的屈曲分析功能,计算其稳定超载系数并用突变理论分析了高薄拱坝的稳定问题,分析表明,其稳定性判别结果与有限元稳定计算结果相吻合。
2)  super high and thin arch dam
特高薄拱坝
1.
The result shows that buckling effect should be paid much attention in design of super high and thin arch dams,and the stre.
高薄拱坝几何参数进行了统计分析,根据此分析结果建立了特高薄拱坝稳定分析概化模型。
3)  thin arch dam
薄拱坝
1.
Based on the theory of shells and variational principle,with the spline finite element method,a semi analytical method which is used to analyse thin arch dams is presented in this paper.
针对拱坝静力分析的有限元法计算复杂,且存在解决坝型选优问题时精度不高等缺点,以壳体理论和能量原理为基础,提出了薄拱坝静力分析的样条半解析法。
2.
Taking two typical thin arch dams as example,overloading factors and stress state,failure pattern are calculated by use of multi-arch centilever plastic limit analysis method.
根据塑性极限分析的静力法和机构法原理,推导了拱坝极限荷载上、下限值的线性规划数学模型,并选择两座典型薄拱坝为例,采用多拱梁塑性极限分析法计算了极限状态下的超载系数和应力状态、破坏形态,验证了薄拱坝极限承载能力及安全可靠性。
4)  High arch dam Abutment
高拱坝坝肩
1.
3D numerical simulation on deformation and stability of high arch dam abutment
高拱坝坝肩岩体变形稳定性的三维数值模拟
5)  high arch dam
高拱坝
1.
Main engineering geological problems in high arch dam of Weihou hydropower station;
广西威后水电站高拱坝主要工程地质问题
2.
Study on stress control standards of high arch dam with self-adaptive finite element method;
利用自适应有限元研究高拱坝的应力控制标准
3.
Study on the safety-monitoring index for high arch dams based on Monte-Carlo;
基于蒙特卡罗方法的高拱坝变形监控指标拟定
6)  high arch dams
高拱坝
1.
The dynamic contact model of nonlinear seismic response of high arch dams with contraction joints;
有横缝高拱坝非线性地震响应动接触模型
2.
Failure probability calculation of high arch dams with multi-failure modes;
具有多个失效模式的高拱坝失效概率计算
3.
The discussion on optimization of layout of high arch dams and power water passages;
高拱坝枢纽及发电输水系统优选布置探讨
补充资料:拱坝应力分析


拱坝应力分析
stress analysis of arch dam

  gongba yingli fenxi拱坝应力分析(stress analysis of arehdam)研究拱坝坝体和地基在各种荷载作用下的应力和变形的方法。在拱坝设计中,拱坝体形和厚度的选择,混凝土标号及地基软弱部位的加固等,均须参照应力分析的结果来确定。拱坝的应力分析,包括数学分析、结构模型试验和原型观测。原型观测是在已建成的坝上进行观测,了解其工作安全状况,校验设计结果,并为以后的科学研究提供资料。 拱坝由于结构复杂,小型工程可采用拱冠梁法。对于大型工程,过去多采用拱梁试(分)载法和结构模型试验。薄拱坝有采用有限差分法的。20世纪70年代起,逐渐采用有限单元法。 为了统一标准,在规定最大设计应力的同时,须规定应力分析方法。因拱坝的应力分布和最大拉、压应力,常随分析方法而改变。考虑各国已建成的大型拱坝都有拱梁试(分)载法的计算结果,拱坝应力分析如采用拱梁试(分)载法,可与已建拱坝进行对比,便于作出安全的评价。 拱梁试(分)载法将空间壳体化为杆系来计算,力学概念明晰,在计算过程中,能逐渐了解其力学机理,便于修改体形和调整厚度,但只能算出坝体应力。在分析地震反应、孔口影响及地基不均匀性等方面,不如有限单元法好。目前,国内外均有拱梁试(分)载法和有限单元法的通用程序。一些大型拱坝设计,常同时采用这两种方法,有时还辅以结构模型试验。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条