1) air heater
暖风器
1.
In this paper,the influence on the boiler efficiency from the operation of air heater was analyzed.
对暖风器运行对锅炉效率的影响进行了计算分析。
2.
The surge alarm of the axial-flow forced fan on Side B of Unit 2 boiler in Zhuhai Power Station is analyzed,and the root cause is deemed to be the blockage of the air heater that increased the resistance in the air duct.
分析珠海发电厂2号炉B侧轴流式送风机发出喘振报警信号的根本原因是暖风器引起风道阻力增加造成堵塞而引起的, 处理办法是拆除掉毫无作用的暖风器。
3.
To cope with the excessive rise in exhaust gas temperature after the modification of the air heater of a 670 t/h boiler installed at Shengli Power Plant, it is decided to implement a technical scheme of adding a split-body heat-pipe warm-air heater.
针对 6 70t/h锅炉空预器改造后排烟温度升高的问题 ,确定了在空预器后加装分体式热管暖风器的技术方案。
2) steam air heater
暖风器
1.
The steam air heater is often used for preventing low-temperature corrosion and ash clogging in the boiler,but different influence upon economic efficiency of unit in operation may be resulted by different parameters of the said steam air heater.
锅炉常采用暖风器来预防低温腐蚀和堵灰,而暖风器不同的运行参数会对机组运行经济性产生不同影响。
2.
Through analysis of operation parameters concerning the fan and inspection of the secondary air system,it is believed that the main cause was the increase of steam air heater s resistance,making the resistance in secondary air system of the boiler to be increased.
通过对风机运行参数的分析及二次风系统的检查,认为其主要是暖风器阻力增加,造成锅炉二次风系统阻力增加所致。
3.
Constructional character and problems in coiled steam air heater of coal-fired boilers is analyzed and a thinking of new type of tube in tube air heater is proposed.
对燃煤锅炉原有盘管式暖风器结构特点及存在问题进行了分析,提出了新型套管式暖风器的设计思路,探讨了新型套管式暖风器设计制造过程中的几个具体问题。
3) boiler air heater
锅炉暖风器
1.
The use of power boiler air heaters is being discussed, as well as the necessity of its automatic control and its economy.
讨论了电站锅炉暖风器的用途、锅炉暖风器实现自动控制的必要性及经济性,论证了锅炉暖风器能够实现自动控制的热力系统。
2.
To solve the problem about the drain pump of boiler air heater during the operation of 600MW unit in Datong Power Generation Co.
针对大同发电有限公司600MW机组锅炉暖风器疏水泵运行中出现的问题,全面分析了疏水泵无法正常运转的原因,主要采用了更换泵的转子部件的措施,经全面综合改进,重新按所需参数设计新叶轮,加粗轴并提高材料强度,机械密封改为盘根密封,改进装配工艺等措施,并调整优化了运行方式,同时使性能曲线向下倾斜;改后经严格测试,不但很好地解决了疏水泵安全稳定运转问题,而且达到了节能节水的效果,取得了很好的经济效益。
4) air-heating radiator
热风供暖器
5) drainage system of steam air heater
暖风器疏水系统
1.
trofit of drainage system of steam air heater in fossil-fired power plant;
火电厂暖风器疏水系统改造
6) steam-air heater vents pipe
暖风器排汽管道
补充资料:日暖风恬
1.见"日暖风和"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条