1) pile foundations
桩基工程
1.
The mechanical mechanism,working behavior and deformation property of settlement-controlled composite pile foundations are analyzed;and the expressions for the pile number of the composite pile foundations are deduced.
以沉降控制复合桩基为对象,分析其受力机制、工作性态和变形特性,推导复合桩基桩数的计算公式;通过对沉降控制复合桩基沉降量的几种常规计算方法的讨论,建立计算复合桩基沉降量的实用新方法——修正实体深基础分层总和法;并用该方法计算2个沉降控制复合桩基工程的基础沉降量。
2) pile foundation engineering
桩基工程
1.
The quality assurance effect of QC team in pile foundation engineering
QC小组在桩基工程中的质量保证作用
2.
Based on the pile foundation engineering in the terminal of Shanghai Pudong International Airport Phase 2,authors introduce ordered combination of PHC pipe pile and precast concrete square piles,including construction processes,and key construction technology.
结合上海浦东国际机场二期航站楼连廊和主楼桩基工程,介绍了在PHC管桩与预制方桩有序组合的大型桩基工程中施工的整个过程,以及所采用的关键施工技术措施。
3.
Based on the construction of the pile foundation engineering of large bridge in Luhong City,the construction technology of bored pile is presented after adopting pressed grounding for consolidating foundation in karst area having many cavities.
通过对芦洪市特大桥桩基工程施工的实例介绍,阐述了溶洞发育的岩溶地区,采用压力注浆处理加固地基后进行钻孔灌注桩施工技术。
3) pile foundation
桩基工程
1.
With the Grey theory, this paper established the GM(1,1) model in the project of pile foundation, the testing result, and forecast result geared very well, and with the precise check is provided the result is good.
根据灰色系统理论,建立了桩基工程GM(1,1)模型,结合桩基试桩实践,所得预测结果与实际结果吻合较好,经过精度检验,证明精度较高,为桩基工程承载力预测提供了一种可靠的理论方法。
2.
A few design problems such as pile type selection are analyzied in accordance with pile foundation construction in Shuzhou area and some measures are put forward.
针对苏州地区桩基工程中 ,桩型选择等几个设计问题作了初步剖析 ,并尝试提出了解决措施。
3.
At present,the existing information about pile foundation has not been used sufficiently.
某一地区桩基工程在勘察、设计、检测过程中有大量的资料数据与信息,但分散于各设计单位、勘察、施工及检测单位,这些已有的数据资料对于今后的桩基工程实践具有珍贵的参考价值。
4) pile engineering
桩基工程
1.
Establishment of the databsde for pile engineering;
建立桩基工程数据库的初步探讨
5) pile foundation project
桩基工程
1.
Based on the project examples, the main points of quality supervisory controlling of pile foundation project are discussed in this paper.
结合工程实例 ,探讨了桩基工程质量监控的要
2.
Based on their practical work experiences,the authors make a full discussion of the survey methods of pile foundation project.
桩基工程是建筑工程中一项重要的分部分项工程。
6) pile foundation engineering
桩基础工程
1.
Combination certain tall building s pile foundation engineering in karst region of the north of Guangdong, according to different characteristic water-eroded caves, define the relevant water-eroded cave s handle measure, and make the discussion for adopting handle measures of the water-eroded caves.
结合粤北喀斯特地区某高层大楼桩基础工程,根据溶洞的不同特征,确定相应的溶洞处理措施,并对所采取的溶洞处理措施作了讨论。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条