说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 索
1)  cable [英]['keɪbl]  [美]['kebḷ]
1.
Design and research of cable and tensioned bar ductile ability for steel structure system of the suspend-dome;
弦支穹顶预应力钢结构体系与拉杆延性性能设计研究
2.
Friction sliding cable element for structural analysis of prestressed steel truss;
预应力钢桁架结构分析中的摩擦滑移单元
3.
Sliding cable element of structural analysis on cable-held bridge;
托桥结构分析的滑移单元法
2)  rope [英][rəʊp]  [美][rop]
1.
The anti-seismic capability of towering structure with rope is analyzed according the shaking table experiment of the model of Nanjing-shiji-tower.
介绍了南京世纪塔的结构模型振动台试验结果,分析了带的高耸结构的抗震性能。
3)  stayed-buckle cable force
扣索索力
1.
Based on the existing algorithm and through ascertaining the influence matrix of the tensile force in the construction of oblique pulling rope,the optimized stayed-buckle cable force is calculated at each stage of archrib hoisting phase of a model bridge during construction and the designed requirement is fulfilled through empty steel tube in falling state.
在讨论现有算法的基础上,通过确定斜拉施工张拉力的影响矩阵,对扣力进行了优化。
4)  Suosuoquan Formation
索索泉组
5)  anchor cable rope end
锚索索头
6)  cable force
扣索索力
1.
Non-bracket and Cable erection is the main erecting arch ribs method of a long span concrete-filled steel-tube(CFST) arch bridge recently,but it requires to adjust the cable force over and over again,which increases the degree of construction difficulty and arch axis linear control trouble,delays the project limit time.
无支架缆吊装法是目前大跨径钢管混凝土拱桥拱肋节段吊装的主要施工方法,此方法在施工过程中须反复调整扣力,施工难度大,拱轴线形控制繁琐,工期长。
2.
Research purposes: By summing up the advantages and disadvantages of using the torque balance method and the finite element "zero displacement method" to determine the cable force,the optimal calculation method is used for the Luobuxi Bridge to guarantee the linear accuracy in arch rib segment of the bridge and construction safety.
研究目的:通过对力矩平衡法和有限元零位移法确定扣力的优缺点分析,针对落布溪大桥拟定的扣方案,采用优化后的计算方法确定最优扣力,确保本桥拱肋节段安装的线形精度和施工安全。
3.
Taking Da-ning River Bridge in construction as the engineering background,the optimization analysis of cable forces and segmental cambers has been carried out during the process of arch rib segmental installment.
以在建的大宁河大桥为工程背景,开展拱肋吊装过程扣力和预抬量的优化分析。
补充资料:
【索】
 (物名)不动之金刚索,观音之罥索等。不动之索为束缚恶人之标示。观音之索为网罗善类之标示。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条