1) Job-Shop scheduling
Job-Shop调度
1.
Dynamic enhanced CPT for the job-shop scheduling constraint satisfaction optimization problem;
动态加强CPT解job-shop调度约束满足优化问题
2.
A Genetic Algorithm Presentation of Job-shop Scheduling Problem;
Job-shop调度问题的一种遗传算法表示方法
3.
A kind of quantum genetic algorithm with operation-based encoding and decoding is proposed for solving Job-Shop scheduling problem,a typical NP-hard combinational optimization problem.
提出了一种基于操作方式进行编码和解码的量子遗传算法,并将其用于求解一种典型的NP-hard组合优化问题即Job-Shop调度问题。
2) Job shop scheduling
Job shop调度
1.
Job Shop Scheduling Project with Process Relativity And its Disjunctive Graph Modeling;
考虑工序相关性的Job Shop调度问题及其析取图模型
2.
Job Shop scheduling with uncertain processing time based on ant colony system;
基于蚁群算法的不确定条件下的Job Shop调度
3.
New encoding method for GA-based solution to Job Shop scheduling optimization;
基于遗传算法求解Job Shop调度的编码新方法
3) scheduling / Job Shop
调度/Job-Shop
4) Job-Shop scheduling
Job-Shop类调度
1.
A Job-Shop scheduling solution based on neural network;
基于神经网络的Job-Shop类调度问题
5) job-shop scheduling
Job-shop调度问题
1.
This paper proposes a new adaptive neural network , based on constraints satisfaction, and heuristics hybrid algorithm for job-shop scheduling.
针对Job-shop调度问题,本文提出一种新的约束满足自适应神经网络和启发式算法混合方法进行求解。
6) Job-shop scheduling problem
Job-shop调度问题
1.
Genetic-algorithm-based resolution on Job-Shop scheduling problem;
基于遗传算法的Job-Shop调度问题求解
2.
Solving the Job-shop scheduling problem based on improved particle swarm algor;
应用改进微粒群算法求解Job-shop调度问题
补充资料:inorganic zinc rich shop primer
分子式:
CAS号:
性质:此类涂料主要由基料、锌粉、着色颜料、填充料和添加剂等组成。基料起黏结锌粉的作用,主要品种有硅酸烷基酯、硅酸烷基酯/钛酸烷基酯、硅酸烷基酯/硼酸烷基酯及其他改性品种。锌粉一般用超细锌粉,颗粒度0.2~12μm,平均粒度5μm,用量50%~80%。施工干膜厚一般20μm左右,兼具电化学保护和化学防蚀双重作用。户外耐久性可达6~8个月,适用于周期较长、防腐蚀要求较高的场合(如造船业防腐)。
CAS号:
性质:此类涂料主要由基料、锌粉、着色颜料、填充料和添加剂等组成。基料起黏结锌粉的作用,主要品种有硅酸烷基酯、硅酸烷基酯/钛酸烷基酯、硅酸烷基酯/硼酸烷基酯及其他改性品种。锌粉一般用超细锌粉,颗粒度0.2~12μm,平均粒度5μm,用量50%~80%。施工干膜厚一般20μm左右,兼具电化学保护和化学防蚀双重作用。户外耐久性可达6~8个月,适用于周期较长、防腐蚀要求较高的场合(如造船业防腐)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条