1) steel brace transform storey
钢结构支撑转换层
2) steel support structure
钢支撑结构
1.
The steel support structure of a boiler is complex,which bears a heavy load and concentrated on some location.
锅炉钢支撑结构复杂,承受荷载较大且作用位置集中。
4) Steel Supporting Platform
钢结构支撑平台
5) the steel structure supports
钢结构内支撑
6) steel braced-frame structure
钢支撑-框架结构
1.
In order to realize simulated seismic test of large complex steel braced-frame structure at shaking table,regarded main plant structure of some active service large thermal power plant as prototype and according to equivalent principle of structural static and dynamic property,the whole large scale shaking table test model was designed and made.
为了在振动台上实现大型复杂钢支撑-框架结构的模拟地震试验,以某现役大型火电厂主厂房结构为原型,根据结构静、动力性能等效原则,设计制作了大缩比振动台试验整体模型。
补充资料:钢板涂层炉钢结构安装
钢板涂层炉钢结构安装
steel construction installation of plate coating oven
(图2)。烘烤过程中挥发出来的涂料溶剂有爆炸的可壳由下而上分段交替安装,施工中必须保持多段柱组能性,为此,烘烤炉的结构要求既能封闭气体防止外装后的垂直度和各层梁的标高,并作出完整记录。最后逸,又能保证有意外爆炸时炉壳会轻易裂开而不致伤应普遍刷一遍油漆。人。整个炉体采用轻型钢结构框架围护。炉壳板是用两炉壳安装对于水平位置的炉子,可将分段制造块薄层钢板中间充填隔热材料,钢板端部压制成凹凸的炉壳依次吊在已装好的钢平台上,然后逐段校正,使截面,拼嵌而成。整个炉壳处于同一水平和中心线上,壳体各段对位后 再焊成整体。当立式布置时,炉壳随支支晋墙珍 、2典型的重。,的涂后烘烤炉横断面示意、拿{{裴置翼默;纂瑟髦 炉子安装完后,应随即将炉内所有杂 物和灰尘清除干净。 炉体结构安装一般在厂房建成后吊装,吊机应(张泽湘)利用厂房内的桥式起重机,也可用汽车式起重机或履带式起重机、卷扬机等。包括炉体支架安装和炉壳安装两部分。 炉体支架安装炉体支架常用H型钢、工字钢、槽钢、角钢等组成的柱、梁框架结构,用螺栓组装校正后采用焊接。按先立柱后安装梁和斜撑的顺序逐件组装。若起重能力和场地允许,最好在地面组装成片后再吊装。立柱吊装前,应划出中心标记,并以连接梁的牛腿为基准划出标高标记。利用柱底垫铁,及时校正好立柱中心垂直度和标高,并用地脚螺栓固定。节点组装螺栓应在各杆件校正后全部固紧。为使施工方便,钢梯、走台、柱杆应同步安装。立式加热炉炉体较高,其支架钢结构柱子由多段组成,通常可采取支架钢结构和炉gangbon tucenglu gangJlegou anzhuong 钢板涂层炉钢结构安装(steel eonstruction installation of plate eoating oven)钢板涂 层炉是用于对钢板进行镀前加热或涂后供干的生产设 备。其中,典型的加热炉为热镀锌或热镀锡生产线上的 带钢镀前加热炉,典型的烘干炉为涂层生产线上的带 钢涂漆后的烘烤炉,均由钢炉壳和支撑炉壳的钢支架 以及加热用燃烧气体供给管与燃烧废气排放管等组 成。 炉体结构因镀前加热炉和涂后烘干炉而异。 (l)镀前加热炉。有卧式布置和立式布置两种。卧 式布置时,长条形的炉壳安放在支撑钢构架上,起支撑 作用。立式布置时,炉壳分排垂直安装在支撑钢结构的 空格中(图1)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条