1) engineering construction supervision
工程建设监理
1.
The paper reviews three development stages of national engineering construction supervision,and analyses the three important problems in the process after joining into WTO.
文章回顾了我国工程建设监理经历的三个历史发展阶段,分析了加入WTO后,监理企业在发展中出现的三个关键性问题,并结合我国建筑业国情,针对问题提出相应的对策。
2) Construction Supervision
工程建设监理
1.
The construction supervision for most of the civil works in China was initiated in early 1990s and was fully carried out from the middle of 1990s.
我国的工程建设监理工作大多起步于90年代初,全面推行建设监理制度于90年代中期。
2.
This paper explicates the advantage and disadvantage of the construction supervision industry after China become a member of WTO.
阐述了加入 WTO对我国工程建设监理的积极影响和消极影响 ,并从提高建设监理从业人员的素质、增强建设监理单位的综合实力二个方面论述了我国工程建设监理面对“入世”应采取的对策。
3.
Based on the development and practice of construction supervision system in our country,the article studies as how to strengthen construction quality control by construction supervision.
文章结合我国工程建设监理制的发展与实践,对工程建设监理中加强施工质量控制进行了探讨和研究。
3) project construction supervision
工程建设监理
1.
Bidding for project construction supervision is of a new business.
用投标方式取得工程建设监理任务是一项新型业务。
4) project supervision
工程建设监理
1.
In the project supervision, using the general control charts and modern computer technology as control artifice can provide powerful safeguard for the project quality control.
工程质量控制是建设项目目标控制的核心,是工程建设监理工作的重点之一。
5) construction supervision
建设工程监理
1.
Study on the development condition of Suzhou construction supervision industry and relevant suggestions;
苏州市建设工程监理行业发展现状分析及建议
2.
After analyzing the relationship between construction supervision and construction project management, this paper pointed out that changing into project management enterprise is an effective approach for supervision enterprise to promote its power and whole level.
通过对建设工程监理与建设工程项目管理关系的分析,指出了向项目管理企业转变是监理企业提升竞争平台、提高系统实力和整体水平的有效途径之一,并对监理企业如何向项目管理企业转变提出了建议。
6) project construction supervision system
工程建设监理制
补充资料:哪些管线工程不需要申请建设工程规划许可证
下列管线工程不需要申请建设工程规划许可证:
1、工厂、仓库和其他建筑等用地范围内的内部专用管线工程。
2、在施工范围内不影响其他工程建设,并在工程后保证拆除的临时管线。
3、建筑物按照施工图的埋设管线和室内管线。
4、管位轴线和管径不变的原有管线的局部更新。
5、农业生产需要的郊区越野管线和农村广播线。
6、非常时期的临时电线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条