1)  pouring plan
浇筑方案
1.
The construction measures were introduced from mixing ration of concrete,pouring plan,the late poured band designment,expanding agent and concrete maintenance aspects so as to engineering quality of bulk mass concrete construction.
针对大体积混凝土施工的重要性,分析了大体积混凝土施工的主要技术难点和原因,从混凝土配合比、浇筑方案、后浇带设置、掺膨胀剂及混凝土养护等方面详细介绍了大体积混凝土的施工措施,以保证大体积混凝土工程的质量。
2)  pouring scheme
浇筑方案
1.
In consideration of the given conditions of the construction site,the pouring scheme of the mass concrete for the base slab of the basement is determined,the cause of its temperature cracks,which may occur,is analyzed,and the practical measures to control the cracks are put forward in the paper.
结合施工现场的特定条件,确定地下室底板大体积混凝土的浇筑方案,分析了大体积混凝土温度裂缝产生的原因,提出了裂缝控制的具体措施。
3)  casting direction
浇筑方向
4)  pouring method
浇筑方法
1.
Combined with specific engineering, it controls mass concrete from batching concrete?pouring method?monitoring measures and maintenance according to reasons of cracks, it obtains good effect and can be referred in similar engineering.
结合具体工程施工实例,针对大体积混凝土出现裂缝的原因,从混凝土的组料、浇筑方法、监测措施及养护等四方面对大体积混凝土进行控制,取得了较好的效果,为其他大体积混凝土施工工程提供参考。
5)  Pouring Scheme
浇注方案
1.
Design of Rational Pouring Scheme to Ensure Mold Filling and Feeding-One of Series Courses of Speech on Scheme Design for Cast Steel in Investment Casting;
设计合理的浇注方案以保证充填和补缩——熔模铸件铸造方案设计系列讲座之一
6)  cast-in-site construction
现浇方案
补充资料:混凝土浇筑


混凝土浇筑
concrete placement

  到浇筑面之间的距离小于2.0米;③控制浇筑瘾度;一④消除浇筑过程中浮出表面的水分盯⑤在悯鹅洲厚面高计上并柱礼钟狮杆封时叼注右级新得凝土,一表1混凝土浇筑层的允许最大厚度┌─────────────┬───────────┐│一振一捣一器类别 │_侥筑层的允许最大厚度 │├───┬─────────┼───────────┤│令 │电动_一风动振捣器-│振捣器工帐度的。一8倍 ││ ├─────────┼───────────┤│ │漱嘛捣器- │翩器头长度ghl.25倍 │├───┼─────────┼───────────┤│表鸽一│金杯娜和单蜘筋结狮│卜2沁毫米-- ││面一_ ├─────────┼───────────┤│一烬器│在双房钠筋结构中_ │120毫米 │└───┴─────────┴───────────┘表公浇筑混凝土的允许间歇时间20一30工O一205一10 允许间普通硅酸盐水泥 9O 135 195-歇时间份)矿渣硅酸盆水呢及火山灰质硅酸盐水泥I即招O粼{粼撰
  