1) tailrace
[英]['teilreis] [美]['tel,res]
尾水渠
1.
Application of non-dispersible concrete to treatment of scour on tailrace for hydropower station;
水下不分散混凝土在水电站尾水渠淘刷处理中的应用
2.
This paper deals with the parameters developing under the normal operation (nondischarging) seasons, or under the generation states after or before the discharging, such asthe wave heights in the tailrace and the navigation channel, rate and amplitude of the waterrising levels and the velocities etc.
通过水力模型试验,在几何比尺λ=100正态整体模型上,研究水口水电站正常运行期一溢流坝不泄洪;和汛期先泄洪后发电或先发电再泄洪时,电站尾水渠及航道段波高、水位涨率、水位涨幅及流速等水力参数,及其对电站7台机组出力(7×200MW)、机组稳定和通航的影响。
3) tailwater canal
尾水渠
1.
In consideration of the growth of joint fissures and abundance of groundwater in the tailrace region of the Xiaolangdi Hydro Project and the requirement of safe operation of the project, after completion of concrete lining for the side wall and dividing wall of the tailwater canal, 500kN double layer pre stressed anchors were adopted to support the walls.
针对小浪底水利枢纽工程尾水渠区域节理裂隙发育、地下水丰富的情况 ,为确保后期运行安全 ,在尾水渠边墙和隔墙混凝土衬砌后 ,采用双层保护的 5 0 0kN预应力锚杆加强支护 ,并介绍预应力锚杆的结构、技术参数以及施工程序 。
2.
2 tailwater canal of Ertan station increased apparently and was creeping and cracking.
二滩水电站2号尾水渠内侧边坡由于地形地质条件不利,又受爆破和雨季地表渗水影响,坡体变形明显增大,处于蠕变拉裂状态。
4) tailwater channel
尾水渠
1.
Scour analysis and evaluation of tailwater channel at Xin anjiang hydropower station;
新安江水电站尾水渠冲刷分析评价
5) long tailwater channel
长尾水渠
1.
In Angu Power Station on the Dadu River,the navigation pass is about 10km-long tailwater channel,so the unsteady flow of power stations is a most important factor in navigation.
利用物理模型对电站非恒定引起的长尾水渠水位和流速过程线进行实时测量,总结了非恒定流引起的最大水位变率、最大流速及相应比降、最大比降及相应流速,并计算了最不利工况下船舶有效推力和航行阻力。
6) turbine tail race tunnel
水轮机尾水渠
补充资料:水渠
1.水沟。多指人工开凿的水道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条