1) bulb tubular unit
灯泡贯流式机组
1.
Some issues on bulb tubular unit operation;
灯泡贯流式机组运行中的若干问题
2.
By analyzing the inflow, geology condition and economic index of Luodong hydroplant, the author recommended bulb tubular unit applied to enlarge the electricity generation sets, and also he discussed feasibility design.
通过对洛东水电厂的来水量、地质和经济指标等技术资料的分析,认为采用灯泡贯流式机组扩大其装机的容量是可行的。
3.
It recommends scheme of the electrical primary design which serves as a reference for design of hydropower stations with similar bulb tubular units.
可供同类灯泡贯流式机组的水电站设计人员参考。
2) bulb turbine units
灯泡贯流式机组
1.
The installation process of bulb turbine units for Dadingzishan Navigation-Power Station,together with some problems existed during installation and relevant solutions are provided,hoping to provide a reference for similar projects.
主要介绍大顶子山水电站灯泡贯流式机组的机电设备安装过程,同时也介绍了在安装过程中存在的一些问题及解决办法,希望能对相似机组的机电设备安装有所借鉴。
3) [Keywords] bulb-through flow unit
灯泡式贯流机组
4) bulb hydro-generating set
贯流式灯泡机组
5) heavy stay column sets
大型灯泡贯流式机组
1.
The frame of heavy stay column sets for Dongjiang Power Station possesses a great rigidity with large dimension,so its requirements for welds quality and welding deformation are strict.
东江电站大型灯泡贯流式机组机座结构尺寸大、刚性大,对焊缝质量和焊接变形要求较高。
6) bulb type generator set
灯泡贯流式发电机组
补充资料:贯流式水轮机
贯流式水轮机
tubular turbine;straflo turbine
水头3m;水头最高的是百龙滩水电站的灯泡贯流式机组,最大水头18m,额定水头9.7m,最小水头3m,水轮机额定功率33MW,转轮直径6.4m;转轮直径最大的是大源渡水电站的灯泡贯流式机组,转轮直径7.sm,水轮机额定功率30.%MW,最大水头n.24m,额定水头7.Zm,最小水头3m。gUon4IUshl shLJ一IL一{111贯流式水轮机(tubular turbine;straflo tur-bine)过流通道呈直线(或S形)布置的轴流式水轮机。其引水室及尾水管与水轮机一般为卧轴布置。使用水头范围一般为3~25m。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条