2) embankment under construction
施工期路堤
3) stage constructed embankment
分级施工路堤
4) embankment information oriented construction
路堤信息化施工
5) construction separate dike
施工隔堤
1.
Based on the in-situ observation upon the construction separate dike of deposit fields in port,the deformation of dike(lateral displacement and vertical settlement) and the stress transformation of ground soil( accumulation and dissipation of pore pressure) in the process of the land formation and dike construction are studied.
通过对港口堆场的施工隔堤进行现场监测,了解港口陆域吹填与隔堤填筑施工过程中堤身的变形(包括侧向位移与垂直沉降)以及地基土的应力变化(孔隙水压力的增长与消散)情况,掌握土体固结程度和地基变形规律,为控制陆域吹填和隔堤填筑的施工速度提供依据,确保软土地基施工隔堤的稳定。
6) dike construction
堤防施工
1.
The gradual reinforcing method is adopted to control the rate of loading on a soft land base in the dike construction project.
介绍淮河入海水道淤土段堤防工程的施工概况:采用逐步加高法控制软土地基堤防施工加荷速率,即利用堤防本身的质量作为压载,分级逐渐施加荷载,使软土地基强度逐渐适应上部荷载的增加,最后加至设计高度。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条