1)  incremental launching method
顶推法
1.
Incremental launching method as a new concept and effective construction method has brightly prospects,but at present,there is no simulation program which can provide necessary construction and monitor data effectively for construction process of incremental launching method.
顶推法作为一种新颖有效的施工方法,发展前景十分广阔,但目前并没有一套有效的仿真程序可以为顶推法施工过程提供各种必要的施工和监控参数。
2.
Constructing in incremental launching method, the stress of section is incessant change because the girder s site is incessant change.
采用顶推法施工时,由于梁的位置在不断地变化,导致每一个截面在施工中的内力也不断地变化,且每一个截面的正、负弯矩交替出现。
3.
Combined with construction practice,the paper introduced the construction technology of incremental launching method construction of Xiezizai frame bridge of Yuanping Taiyuan freeway for reference.
结合原太高速公路公铁立交施工实践 ,介绍了歇子寨框架桥顶推法施工的技术和工艺 ,供有关工程技术人员参考。
2)  pushing construction method
顶推工法
3)  incremental launch ing
推顶法
4)  top-bunt Slippage
顶推滑移法
5)  incremental launching construction
顶推法施工
6)  incremental launching erection
顶推法架桥
补充资料:顶推运输
顶推运输
pusher transportation service

    以推船和一艘或多艘驳船组成顶推船队进行的货物运输。顶推船队可以灵活系解,推船为船队的动力船,驳船用以装载货物。顶推运输先用于内河航运,并逐渐发展成主要运输方式。最早的顶推运输于 19 世纪出现在美国密西西比河上。第二次世界大战后在各国得到发展。海上顶推运输于20世纪60年代兴起。
    顶推运输特别适合于内河航运。顶推船队总载运量远超过同样吃水的一艘机动货船 , 因而克服了有些航道浅、窄,加大机动货船尺度受限制的弱点。同时,驳船可分散到各港分别装卸,极适宜沿线港点多、装卸作业分散的情况。为提高船队运输的经济效益 , 当前内河顶推船队已实现系列化、大型化和现代化:推船逐步定型、驳船船型标准化,因此形成分节驳顶推船队 。 分节驳结构简单,船员少,装卸方便,推船动力利用效率高;推船功率和驳船尺度逐步加大以充分利用航道尺度,提高运输效益;对运输进行现代化管理,引入先进的技术。
    
   

美国密西西比河上的顶推船队

美国密西西比河上的顶推船队


   
   海上顶推运输由于风浪大,所推驳船的数量通常为一艘,且推船与驳船之间的系结也是关键的技术问题之一 ,其发展受到限制。
    与机动货船相比 , 顶推运输具有运量大、运输货种多、成本低的优点。有的国家顶推船队的总载重量已达8万吨。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条