1) earthwork allocation
土方调配
1.
In order to save the transporting costs of earthwork allocation reasonably, linear programming and MATLAB software are used to calculate earthwork allocation accurately and rapidly.
为了合理节约土方调配的运输费用,采用线性规划的方法,使用MATLAB软件,准确、快速地进行土方调配计算,并且通过南水北调中线一期工程总干渠安阳段第七施工标段土方调配的工程实例,说明该法的具体应用,得出应用线性规划进行土方平衡调配,可以找出最优的方案,降低施工成本,提高经济效益。
2) earthwork blending
土方调配
1.
The application of operational research model in earthwork blending;
运筹学模型在土方调配中的应用
2.
Mathematical modeling used in earthwork blending in civil engineering;
数学建模在土木工程土方调配中的应用
3) earth adaptation
土方调配
1.
Linear optimization is often used in the calculation of earth adaptation,the calculation is a huge operation by human if there are many excavation areas and placement areas in it.
土方调配计算中通常采用“线性规划”法,然而当出现数量较多的填挖区时,采用人工计算则工作量太大,而专业分析软件又往往得不到普及。
4) earth-rock allocation
土石方调配
1.
Study on general earth-rock allocation management system and realization technology;
通用土石方调配管理系统的研究与实现技术
2.
Optimization of earth-rock allocation is an important problem in subgrade construction of road engineering.
通过对土石方调配系统组成、调配关系的系统分析,在考虑开挖、填筑、借土区、弃土区、废料调配的前提下,以系统费用最低为目标,建立了道路工程土石方优化调配线性规划模型。
5) earthwork allocation
土石方调配
1.
Model research on the earthwork allocation of the linear programming;
线性规划土石方调配模型研究
2.
Research’s model for the earthwork allocation of the highway engineering;
公路工程土石方调配模型研究
3.
Two main problems in embankment dam construction, earthwork allocation and construction organization plan, are analyzed firstly in this paper.
就土石坝施工中的土石方调配与坝体施工组织设计优选进行了讨论分析。
6) intelligent earth-rock volume allocation
智能土石方调配
1.
Through analyzing the features of earth-rock volumes allocation of Shuibuya Project,an intelligent earth-rock volume allocation system was developed to model earth-rock allocation in construction.
由于水布垭面板坝的土石方开挖量超过2 000万方,填筑量超过1 560万方,土石方调配问题关系到整个工程的进展和技术经济效益,为此分析了水布垭面板坝土石方调配的特点,并根据数学模型,对水布垭面板坝智能土石方调配系统进行了功能分析和系统设计。