1) human-board system model
"人-板"系统模型
2) new pattern system formwork
新型系统模板
1.
Especially, compared with the traditional system formwork, the new pattern system formwork is introduced with great improvement in recent years.
特别是现在的新型系统模板,与传统的系统模板相比,有了更大的进步,现尚未被引入国内。
3) manikin system
人体模型系统
1.
This paper puts forwad a design to construct the regional development manikin system, analyses the feasiblity, superiority and the principle for regional development, and expounds some important problems to be solved in the regional development in China according to the simulated move of manikin system.
提出了建立区域发展人体模型系统的构想,分析了建立模型的可行性和优势及由人体模型系统得出区域发展所应遵循的几个原则,根据人体模型系统的模拟运行阐述了我国区域发展中所要解决的几个重要问
4) person-board system
人板系统
1.
It is discussed from biomechanics on the board mechanic features, intrinsic vibration frequency and the motor model of person-board system while springboard suffering external force, which provides reference and operational way on how to coordinate person-board system.
将跳水板简化为外伸梁 ,从生物力学的角度探讨跳水板在受外力时 ,跳板的力学特性、固有振动频率和人板系统的运动模式 ,为在运动实践中如何使人板系统协调配合提供理论依据和操作方法 ;为进一步研究跳水板的动态性能、人板系统的运动仿真、跳水运动技术诊断、运动优化以及有关理论研究奠定良好的基
6) formwork system
模板系统
1.
In this article, the author states structural design principles, design requirements and composition of a formwork system for short-match method prefabricated segment beams, and introduces operation modules and precision control methods in prefabrication construction.
介绍短线匹配法预制节段梁的模板系统结构设计原则、设计要求和模板系统的构成,以及在预制施工中的运作方式和精度控制方法。
补充资料:IT系统
分子式:
CAS号:
性质:配电网不接地或经高阻抗接地、用电设备金属外壳接地的配电及安全防护系统。大写字母“I”表示配电网不接地或经高阻抗接地,大写字母“T”表示用电设备金属外壳接地。用电设备外壳的接地即保护接地。其作用是当设备金属外壳意外带电时,将其对地电压限制在安全范围以内,消除或减小电击的危险;该保护接地还能消除感应电的危险。
CAS号:
性质:配电网不接地或经高阻抗接地、用电设备金属外壳接地的配电及安全防护系统。大写字母“I”表示配电网不接地或经高阻抗接地,大写字母“T”表示用电设备金属外壳接地。用电设备外壳的接地即保护接地。其作用是当设备金属外壳意外带电时,将其对地电压限制在安全范围以内,消除或减小电击的危险;该保护接地还能消除感应电的危险。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条