1)  pile-pile
桩-桩
2)  pile-pile
桩–桩
3)  pile cap
桩桩
1.
This paper describes the simulated tests made on 20 testing members, and gives an introductory inquiry into the bearing mechanism and failure status of forked-pile caps afected with the constant load, max.
对20个试件进行模拟试验,初步探讨软土地基上叉桩桩帽在恒载、最大活载、水平荷载和土压力作用下的受力机理和破坏形态,并提出在软土地基上叉桩桩帽的设计建议。
4)  the pile tops in pile groups
群桩桩顶
1.
Based on muli-transmitting boundary and the ANSYS of secondary development,the load distribution at the pile tops in pile groups under dynamic loads on the inclined rock-base is analyzed considering the soil-structure interraction.
本文针对一柱一桩,桩间设置地梁的基础形式,引入了多次透射边界以模拟场地的无限性,利用二次开发后的ANSYS对倾斜基岩上的框架在El-Centro波、Taft波作用下群桩桩顶的荷载分布进行了上下部共同作用分析,以定性的判断地震作用下不同位置桩的受力情况。
5)  cap of single pile
单桩桩帽
6)  vertical pile cap
直桩桩帽
1.
This paper analyzes the methods of determination of bearing capacity and checking calculation for crack resistance of the vertical pile caps of reinforced concrete and shows the calculation table for the design of the vertical pile caps.
对钢筋混凝土直桩桩帽的承载力计算与抗裂验算的方法进行了分析,并编制了直桩桩帽设计计算表。
参考词条
补充资料:梅花桩
梅花桩

    立于桩上练习的一种中国拳术。也常用来作为基础功练习。又称梅花拳,简称梅拳。梅花桩起源于明末,最初以家传形式流传于民间,到清乾隆年间始向外界流传。近代以河北滦县韩其昌传人较多。梅花桩所用木桩,直径 3~5 寸 (1尺=10寸=0.33米),下半截埋在地下,上半截高出地面3尺3寸,桩与桩之间的距离前后为3尺,左右为1尺5寸。随着功夫不断增进,桩要不断加高,有的加高到5尺 ;也有人以砖代桩,先在平砖上练习,再站横砖,进而站立砖。布桩讲究上应天象,下合地时,中合节气 ,如北斗桩 (又名七星桩)、三星桩、繁星桩等。梅花桩因立于桩上练习,故有别于诸拳,也不同于南拳中的梅花桩拳套,其难度远非地面上练习可比,练起来要求式正势稳,要建立严格的动力定型。梅花桩最适合两人以上的集体练习,众人围成一梅花状,忽开忽合,伸缩无定,饶有兴味。其套路除五式固定外,无一定型,其势如行云流水,变化多端,活而不乱。梅花桩分大架小架两种。桩势 (式)有五式 。步法有八方步和行步两种。梅花桩的器械练习套路有大刀、大枪十二路和大杆劈刺法;长柄器械有戟、枪、棍、槊、镗、耙、倒钩矛、梢子杆等;刀剑钩刺类有连环刀、剑、虎头钩、月牙刺等;此外还有流星锤等。练梅花桩应注重五式桩步的静力练习,这有利于练出通身一体的摔打功夫。练梅花桩要求用鼻均匀地做腹式呼吸。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。