This paper expatiates the significance,the develop course and the direction of the 3D design,compares the characteristic and the differences of the 3D design softwares which are popular in and out of home now,makes 3D modeling and FEA analysis of the complex engineering,takes the double-level intake tower as an example,intr.
本文阐述三维设计的重要性、发展历程及方向;比较目前国内外流行的几种三维设计软件功能上的特点与差异;对复杂工程进行三维建模与有限元分析,以双层取水口为例,介绍CATIA软件在工程三维设计中的应用;实现CATIA与ANSYS的联合使用以及三维设计二维出图。
2) stratified intake
分层取水进水口
3) intake
[英]['ɪnteɪk] [美]['ɪn'tek]
取水口
1.
Design of sediment prevent for intake of Gaoqiao Hydropower Station;
高桥水电站取水口防沙设计
2.
Model test of surface water intake of Jining Canal Power Plant;
济宁运河发电厂地表水取水口物理模型试验研究
3.
Analysis of submarine scouring and silting in the area around the intake of Songyu Power Plant;
厦门嵩屿电厂取水口附近海域冲淤变化分析
4) inlet
[英]['ɪnlet] [美]['ɪn'lɛt]
取水口
1.
The research for the inlet of weir style test in phase one of Xiong power station of Huadi town;
华电镇雄电厂一期取水口拦沙坎样式试验研究
2.
The fluid field of Chuanwei inlet project was calculated in different situation of discharge after the Three Georges Project running.
采用二维水流泥沙数学模型建立贴体正交网格,对川维厂取水口河段在三峡成库后进行不同流量工况下的流场计算,运用一个水文系列年循环计算出成库后该河段的悬移质淤积过程、淤积量、淤积分布。
3.
According to the model test on the river reach where Chongqing East&West power plant lied,the sediment aggradation and river evolvement,the change of flow condition,the effect of floater on inlet were analyzed,The layout of inlet was optimized also.
通过模型试验研究,分析了重庆电厂东、西厂取水口河段泥沙淤积与河床演变、水流条件的变化以及漂浮物运动对取水口的影响,优化了取水口的布置,结果表明:取水口取水条件较好,漂浮物对其影响较小。
5) water intake
取水口
1.
Model tests on water intakes of Haerbin No.1 Thermal Power Plant;
哈尔滨第一热电厂取水口模型试验研究
2.
3 D simulation of the flow and sediment transport near a water intake;
取水口附近水流泥沙运动的三维数值模拟
3.
According to the design, the measures of sediment prevention include the following aspects: (1) locating of the water intake accord with the laws of water and sediment flow;(2) arranging local structures preventing sediment in front of the sluice; (3) diverting surface_layer water twice.
试验表明,设计通过合理选择取水口位置、布置闸前局部防沙设施,以及两次表层取水,有效地解决了枢纽的防沙问题;特别是取水口前纵向螺旋流的存在,不仅保证了昌马水库泄空期间的大量底沙可顺利排往取水枢纽下游,同时取水口前又可实现“门前清”的最佳防沙效果。
6) water intake and outlet
取排水口
1.
Temperature field of water intake and outlet of tidal river bend;
潮汐弯道段取排水口温度场研究
补充资料:分层取水式进水口
分层取水式进水口
multi-level intake
feneeng qushu咨shiJ,nshujkou分层取水式进水口(multi一level intake)从成层型水库有选择地引取任一层库水的取水结构.设在取水涵管或隧洞进口处,又称分层取水结构。成层型水库是指库内水温、溶解氧、浑浊度、浮游生物、二氧化碳等具有沿深度成层分布特点的水库。分层取水又称选择取水。只用一f引取水库面层水的取水结构称为表层取水结构。它是选择取水的一种特殊方式。只能引取下层或底层库水的取水结构称为深式取水结构。成层型水库从不同库水深度处取水,其水质显著不同,对下游农业生产、水产养殖、生态、人类生活和健康等也将带来不同影响。设置表层取水结构可获取面层温水,使灌区农作物增产,利于下游水产养殖,并免除因深孔放水而产生的各种冷害影响,但更全面地解决水质问题则有赖于分层取水结构。 取水口型式及布置方式分层取水的取水口有同定式及活动式两种。活动式取水口在运行中可放置于水库有效取水深度范围内的任一高程处,按需要引取该深度处的库水。按水力特性和结构型式的不同,取水「1又可分为孔流型、管流型、溢流型和吸入型。溢流型通常由最上层进水闸门门顶溢流引取库水进入取水结构。为改善入流条件以提高取水效果,可在最上层加设水平导水板或加设喇叭形取水盘,并可在喇叭形取水盘上加设辐向隔涡板(整流板),以防止产生涡流。如果在圆筒型门顶的取水盘上设置带有倒圆锥的圆盘形制流子,用隔涡板将制流子与取水盘连接成整体,即成为吸入型取水口,又称吸入型取水装置(图1)、分层取 制流r//隔涡板取水盘’图1吸入型取水口水结构目前主要有以下几种型式:斜置式分层取水结构是沿库岸坡面或坝坡面倾斜设置的取水结构。有斜卧管式及斜塔式两种。中国修建的斜卧管式进水口多为孔流型固定取水口。2()世纪50年代初期,取水口闸门多采用塞子式简易型,只能用于小型水库表层取水。20世纪60年代中期以后,取水口闸门多采用转动圆盘式或升降式平面门。斜塔式常沿坝面或库岸坡面倾斜放置,多采用溢流型平面门或半圆筒门。 竖塔式分层取水结构为一封闭式独立塔,塔壁或塔内设取水口根据取水口能否移动而分为固定式及活动式两种。固定式是在不同高程设置一道或数道多层进水孔口,多用于表层取水。固定式取水口闸门有平面升降门(图2)、平面转动门等。中国四川省升钟水库右干渠进水口即采用了多层平面升降门,设计取水流量为45米“/秒,为目前中国国内取水流量最大的表层取水结构。