1) Cost and schedule
费用与进度
1.
Estimation of risk joint probability to cost and schedule integration based on joint probability distribution theory
基于概率联合分布的费用与进度联合风险估计
2.
Using independent estimating techniques, the high confidence percentile estimating values for cost and schedule can’t be gained simultaneously, and the cost risk and the schedule risk are increasing in the actual projects.
费用与进度的联合置信估计是指费用置信百分位点估计和进度置信百分位点估计的联合估计。
2) schedule and cost
进度与费用
1.
Integrating management of schedule and cost for the owner of construction project;
业主对建设项目进度与费用的整合管理
3) progress and cost control
进度与费用控制
1.
the network schedule of each level for every unit, in the actual combat of this project\'s schedule,progress and cost control, this paper mainly described the schedule target\'s program,control and application, wish that can elicit a better view from you when a similar project occur nearby.
阐述了应用p3e/c软件在该项目计划、进度与费用控制实战中的计划目标的建立、控制与应用,旨在为同类项目在计划、进度与费用控制上起到抛砖引玉的作用。
4) schedule-expense
进度-费用
1.
The mathematical model for schedule -expense-control is set up in this paper.
该文运用MIS基本原理与网络计划管理原理,就其中一个子系统,即“进度-费用”控制子系统作了分析。
5) integrated control of cost and schedule
费用与进度联合控制
6) Cost and schedule integrated risk analysis
费用与进度集成风险分析
补充资料:保险的费用(含施救费用与救助费用)
保险的费用(含施救费用与救助费用)
保险的费用(含施救费用与救助费用)保险人即保险公司承保的费用。即当保险标的物遭遇保险责任范围内的事故时,除了能使货物本身受到损毁导致经济损失外,还会产生费用方面的损失,这种费用保险人也给予赔偿。 可保险的费用主要有以下几种:①施救费用。指在国际货物运输保险中,发生承保责任内的事故或自然灾害,被保险人或者他的代理人、雇用人员为防止损失扩大而进行抢救行为所支出的合理费用。保险人对这种施救费用,负责赔偿,以鼓励被保险人对货物积极抢救。②救助费用。保险标的物发生承保责任范围内的自然灾害或意外事故,由保险人和被保险人以外的第三者来解救危险,获救方应该向救助方支付相应的费用,这种费用就是救助费用。它属于共同海损的费用支出。③特别费用。指运输工具遭遇海难后,在避难港由于卸货所引起的损失,以及在中途港、避难港由于卸货、存仓及运送货物所产生的费用。这种费用也属于保险人赔付范囿。