1) floor strengthening
楼板加固
1.
Many strengthening methods were used in the project inclu- ding the overall strengthening method by adding reinforced concrete walls,foundation strengthening by piles, columm strengthening by increasing section,beam strengthening by gluing carbon fiber composite sheets or by increasing section,floor strengthening by casting new reinforced concrete slabs,and so .
介绍了80年代按照老规范设计的非抗震建筑在满足新规范的条件下的加固设计,包括局部增加混凝土墙的整体加固设计、补静压锚杆桩的基础加固设计、四边加大截面的柱加固设计、加大截面法和粘碳纤维的梁加固设计、补现浇板的楼板加固设计等诸多方面,其做法可以作为同类加固设计的参考。
2) filler joist floor
加固搁栅楼板
3) the floor reinforcement and transformation design
楼板加固改造设计
4) reinforcement of old buildings
旧楼加固
5) loading of floor
楼板加载
1.
From performances of concrete,striping time,loading of floor, human factors and other aspects reasons caused the cracks in cast-in-place floor are analyzed;at the same time corresponding technical measures are proposed in order to ensure construction quality of floor.
介绍了现浇板裂缝的常见部位,并从混凝土的性能,模板拆除时间,楼板加载人为因素等方面分析了现浇板裂缝产生的主要成因,最后对现浇板施工应采取的技术措施及裂缝的弥补措施进行了阐述,以保证现浇板的使用质量。
6) floor acceleration
楼板加速度
补充资料:高层建筑组合楼板工程
高层建筑组合楼板工程
暑 高层建筑组合楼板工程一
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条