1)  post-construction settlement
工后沉降
1.
Influence factors on post-construction settlement of high backfills adjacent to abutment;
桥台后高填方路堤工后沉降影响因素分析
2.
Analysis of negative effect of geotextile on long-term stability and post-construction settlement of embankment;
土工合成材料对路堤长期稳定性及工后沉降的负面影响分析
3.
Numerical analysis on post-construction settlement of pile group foundation for Taizhou Yangtze River Bridge
泰州长江大桥群桩基础工后沉降数值分析
2)  settlement after construction
工后沉降
1.
Study on the interface height of embankment and bridge for high speed railway based on the settlement after construction of subgrade in soft soil zone;
高速铁路软土路基工后沉降对桥路分界高度的影响研究
2.
Soft ground settlement after construction prediction with flat dilatometer test;
用扁铲侧胀试验计算软基处理工后沉降
3.
In order to keep track even and steady in high speed railway,it is necessary for no embankment settlement after construction;but red beds are easy to collapse and soften,which belongs to stuffing for the third grade.
为了保持轨道的平顺性和稳定性,高速铁路要求路堤的工后沉降为0。
3)  post construction settlement
工后沉降
1.
Discussion on application of preloading method in soft ground post construction settlement;
浅议预压法解决软土地基工后沉降
2.
Estimation of post construction settlement of ground with vertical drains;
竖向排水井地基工后沉降预测
3.
The experimental research of post construction settlement observation of railway roadbed;
铁路路基工后沉降观测的试验研究
4)  residual settlement
工后沉降
1.
Deformation of sheet plate due to residual settlement of pile-net composite foundation;
桩—网复合地基工后沉降的薄板理论解
2.
Three Point Calculation Method of Residual Settlement About Pile-Net Composite Foundation;
三点法推算桩—网复合路基工后沉降
3.
The pile-supported embankment is a new embankment structure introduced into China recently,which can control the residual settlement of the embankment reasonably and effectively and has a wide application prospect.
桩承式路堤是近年来引入国内的一种合理有效的控制路堤工后沉降的新型路堤结构形式,有着广泛的应用前景。
5)  post-load settlement
工后沉降
1.
Application of data processing methods in prediction of roadhead post-load settlement;
数据处理方法在路堤工后沉降预测中的应用
2.
Prediction of the post-load settlement of high embankment by artificial neural network;
用人工神经网络模型预测高填方地基工后沉降
6)  method of settlement after construction
工后沉降法
1.
The final settlement in the method of settlement after construction is corresponding to the design load.
工后沉降法中最终沉降应是设计荷载——等载预压下所对应的最终沉降,对于超载预压、欠载预压,应根据监测资料确定沉降与填土高度的关系,从而根据超载预压、欠载预压监测资料推算得到等载预压对应的最终沉降量。
补充资料:LW卧式螺旋卸料沉降离心机
设备概述:

 LW卧式螺旋卸料沉降离心机按流动方式分可分为逆流式和并流式两种,按分离相数分可分为两相分离型和三相分离型,按结构划分又可分为普通型、防爆型和密闭型三种。是一种使用面很广的离心机,主要用于获得较干的滤饼(固相脱液)或较清的分离液(液相澄清)。它既可以用于分离含固相颗粒≥0.005mm 的悬浮液,也可用于固相颗粒的分级,更适合于分离对滤布再生有困难的物料,以及浓度、颗粒度变化范围较大的悬浮液,滤饼亦可洗涤。这种离心机不适合于固相比重差很小或液相比重大于固相的悬浮液分离。该机具有连续操作、处理量大、电耗低的特点。被广泛用于化工、食品、环保、轻工、采矿等工业部门,如聚氯乙烯、低压聚乙烯、聚丙烯、淀粉、碳酸钙、尾煤分离、动植物油脂净化、工业污水和城市生活污水的处理等。立式沉降离心机更适合于有密闭、防爆要求的场合。
 

                                   ↑
                         LW卧式螺旋卸料沉降离心机 
 

                                    ↑
                        LW卧式螺旋卸料沉降离心机原理图 

 工作原理:

 卧式螺旋卸料沉降离心机利用悬浮液中固、液相密度差,在转鼓高速旋转所产生的离心力场中使固相迅速沉降于转鼓壁,从而使固液两相分离。离心机启动后,悬浮液(物料)由进料管加入螺旋内筒,进而流入转鼓,在离心力作用下固相沉降到转鼓壁上,由螺旋输送器将其推向转鼓小端从出渣口排出,澄清的液体从转鼓大端的溢流口溢出。离心机连续进料、连续分离、分离液和沉渣分别连续排出。
 
 典型用途:

 化工:硫酸铵、氧化铝、硫酸钡、氧化铅、活性碳、二氧化钛、硫酸亚铅、染料、磷酸二氢钠、颜料等。
 石化:硝化纤维、聚氯乙烯(PVC)、聚丙二醇、聚苯乙烯、聚甲基丙烯酸甲脂等。
 食品:苹果汁、花生油、鱼肉绞汁、油脂、咖啡液、菜籽油、胡萝卜汁、淀粉、葡萄汁、动物油、豆乳、大豆蛋白、棕榈油、面粉等。
 矿业:选矿洗涤水、各种石膏、石膏排水、焦油残渣、氧化铁、氯化亚铁、各种氢氧化物、各种含油排水、各种粉尘洗水等。
 机械:苯乳浊液、压延废油、切削油、煤焦油、冷却油等。
 环保:废油、石油罐淤泥、市政污水、皮革废水、染料废水、禽畜场排水、生活废水、粪便污泥、各种工厂废水等等。 

 
 技术参数: 
项 目 \ 型 号
LW200×600-N
LW355×1460-N
LW450×1810-N
LW500×1500-N
转鼓直径 mm
200
355
450
500
转鼓长度 mm
600
1460
1810
1500
转鼓转速 r/min
5000
3500
3200
2720
分离因数
2795
2433
2570
2100
生产能力 m3/h
1 ~ 2
4 ~ 8
8 ~ 18
12 ~ 24
电机功率 kW
5.5
18.5
30
37
长×宽×高 mm
 
1545×1930×774
3470×1785×1055
3380×1540×890
3573×3164×1112
机器质量 Kg
950
2650
3200
4070
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条