1) discharge capacity
泄流能力
1.
Some discussion on discharge capacity of discharge structure;
浅析泄水建筑物的泄流能力
2.
Flood and discharge capacity recheck for Laxiu reservoir;
拉秀水库洪水及泄流能力复核分析
3.
Discussion on discharge capacity formulas for weir sluice and tunnel;
堰闸隧洞的泄流能力计算公式商榷
2) discharge capacity variation
泄流能力变化
1.
Analysis on influence of discharge capacity variation at Yichang station on the design flood of Gezhouba project;
宜昌站泄流能力变化对葛洲坝设计洪水影响
3) reliability of designed discharge capacity
设计泄流能力可靠度
5) flood discharge capacity
泄洪能力
1.
In this paper variation in flood discharge capacity of the Yangtze River ChenglingjiLuoshan reach after completion of Three Gorges Project and flood control situation the reach will be faced with after operation of Three Gorges Reservoir are analyzed.
分析了长江城陵矶~螺山河段行洪能力的变化和三峡水库运行后该河段面临的防洪形势,指出降低城陵矶河段水位的有效措施之一是恢复河道原有的泄洪能力,实施牌洲裁弯、清淤疏浚和削矶扩卡等为主的工程措施。
2.
Based on the floodway model test of Hechuan diversion works,this paper analyzes the flood discharge capacity of its floodway,and presents a scientific and reasonable project proposal for the analogous of water conservancy project.
泄洪洞的泄洪能力直接影响水库的行洪安全。
6) discharge capacity
泄洪能力
1.
Influence of discharge width ratio of two branches of a low water head project at branching channel on flood discharge capacity;
分汊河段低水头枢纽两汊泄流宽度对泄洪能力的影响
2.
The text adopts traditional hydraulics method to calculate the flood discharge capacity of certain tailing pond drainage system, fix on the relationship curve between the water level of the tailing pond and the discharge, then process reservoir flood routing according to the water-balance equation, at last choose the ap.
本文采用传统的水力学方法对某工程尾矿库的排洪系统的泄洪能力进行计算,确定尾矿库的水位与下泄流量关系曲线,然后根据水量平衡方程进行调洪演算,确定排洪系统所需的调洪库容和调洪水位,从而为尾矿排洪系统设计提供可靠的依据。
补充资料:流泄
流泄
流泄 病证名。指泻下稀便如水流,即泄泻病。《素问·六元正纪大论》:“太阳所至为流泄禁止,病之常也。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条