说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 隧洞工程
1)  tunnel engineering
隧洞工程
1.
Summarizing experiences in construction management of tunnel engineering,this paper discusses how to set up an effective encouraging mechanism in construction and management of tunneling engineering in order to fully mobilize the enthusiasm of the masses and to enhance the level of construction management.
通过对隧洞工程施工管理经验的总结 ,介绍了在隧洞工程的施工管理中如何建立有效的激励机制以充分地调动员工的积极性 ,从而提高隧洞工程的施工管理水平。
2.
Dahuofang Reservoir Water Diversion Tunnel Engineering is the longest tunnel engineering in the world at present.
针对本工程实际,以循环运行网络模拟理论为基础,建立了隧洞工程掘进机法施工过程模拟模型,并开发了相应模拟计算软件。
3.
Constructing condition of tunnel engineering is very complicated ,and the variable factor is much more ,and the past experiencing safety management are not adapted to requirement of modern management ,so the modern science management method -system safety engineering-come into being .
隧洞工程的施工条件是非常复杂的,并且存在的不稳定因素比较多,安全隐患很大。
2)  tunnel project
隧洞工程
1.
Taking the tunnel project of Jingshi Superhighway in south-to-north water diversion project as the example, this paper expounds the excavation method, quality control measures and construction points of tunnel project passing through the silt stratum.
以南水北调穿越京石高速隧洞工程为例,叙述了通过粉砂地层隧洞工程的开挖方法、质量保障措施及施工要点。
2.
Starting from speciality of tunnel project construction,it illustrates contractor’s claim to tunnel construction and points out importance & necessity of claim to contractors from aspects of work of priparation,propoundation of claim and noteworthy items.
隧洞工程施工的特殊性出发 ,阐述了承包商对隧洞施工索赔中的准备工作、提出索赔及索赔的注意事项 ,指出索赔对承包商的重要性和必要性。
3)  tunneling project
隧洞工程
1.
The construction condition of hydraulic tunneling project is always very complicated with more variable factors.
水工隧洞工程是施工条件非常复杂的,并且存在的不稳定因素比较多,过去的经验型安全管理已不能适应现代化管理的需要。
4)  Tunnel construction
隧洞工程
1.
Based on the field engineering geological reconnaissance and the engineering geological classification of and evaluation on the wall -rock, this paper analyzes and evaluates the geological condition of general trunk tunnel construction from NO.
在野外工程地质勘察及洞室围岩工程地质分类评分的基础上,对张峰水库总干16至20号隧洞工程地质条件进行了分析与评价。
5)  Long tunnels
长隧洞工程
1.
Long tunnels of inter-watershed water transfer projects in China;
我国跨流域调水的长隧洞工程
6)  tunnel project region
隧洞工程区
1.
Because of the special terrain condition (the long axes) in the tunnel project region, the method to adopt trapeziform distribution load instead of the common uniform load is used to simulate the horizontal tectonic stress so as to improve the regression precision.
针对隧洞工程区特殊的地形条件(洞身很长),通过用梯形分布荷载代替常用的均布荷载来模拟水平向构造应力来提高回归的精度,对锦屏隧洞区地应力场进行回归拟合计算,复相关系数由0。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条