1) segment precasting
节段预制
1.
In this paper,the principal construction techniques for the main arch of the bridge are briefly described,in which the segment precasting,cable crane installation and construction monitoring are included.
简要介绍主拱的主要施工技术,包括节段预制、缆索吊机安装以及施工监测等。
2.
The construction of a reinforced concrete deck box arch bridge was carried out by segment precasting,cable crane installation and cantilever erection by the aid of stayed cables with the cables fixed by the anchors embedded in rocks.
上承式钢筋混凝土箱形拱桥,采用节段预制,缆索吊机安装,扣锚索悬臂架设。
2) precast segment
预制节段
1.
The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and the superstructures of the parts of the bridges were erected by precast segmental assembling construction method.
苏通大桥主引桥为双幅6车道75 m跨等截面PC连续梁桥,其上部结构采用预制节段拼装架设的施工方法。
2.
The precast segmental construction technique is widely used in the viaduct structures for both vehicular and light rail systems.
预制节段拼装连续梁桥可广泛应用于高架桥和轻轨等建设项目。
3) prefabricated segment
预制节段
1.
Based on the practice and summary of Hu-Min Viaduct (II) construction in Shanghai by erecting prefabricated segments span by span, des-cription is made of the mechanism and way of computer-aided control (CAC) over the load transformation, a key step of workmanship.
通过对上海市沪闵路高架道路二期工程中预制节段逐跨拼装施工的实践和总结,在介绍预制节段逐跨拼装施工的基础上,叙述了运用荷载转换这一关键工艺进行计算机辅助控制的原理与方法。
2.
Described hereby are the initial study and summary of the key measures and precautions taken during the construction of prefabricated segment span-by-span installation of Hu-Min Rd Viaduct (II), and Jungong Rd Viaduct (Contract A1.
1标军工路高架预制节段逐跨拼装施工的实践为基础,初步探讨、总结了该类施工方法在技术管理上前期预备阶段、实施准备阶段、实施阶段的主要方法和注意点。
3.
The elevated bridge in the partial main line of Shanghai Humin Elevated Road Phase II Project used the prefabricated segmental erection construction technique by spans.
上海市沪闵高架二期工程部分主线高架桥采用了预制节段逐跨拼装的施工技术,主线桥宽达25m,底面为弧形。
4) precast segmental
预制节段
1.
As a credible, economic and practical construction method, precast segmental construction has been widely accepted and utilized in the practical projects all over the world.
预制节段拼装体外预应力结构紧密结合着现代施工工艺和预应力的发展方向。
2.
The method of precast segmental construction began to evolve 40 years ago.
预制节段拼装施工法是近四十年内才发展起来的施工方法。
5) prefabricating of segmental beam
节段梁预制
6) precast segmental beam
预制节段梁
1.
The application of steam curing process for precast segmental beams of Humin Elevated Project has increased the early strength of concrete and met the requirements of construction progress.
沪闵高架工程预制节段梁采用蒸汽养护的工艺,使混凝土早期强度增长,满足了施工进度要求。
补充资料:节段性回肠炎
节段性回肠炎
即"克隆病"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。