说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 整体提升
1)  integral lifting
整体提升
1.
Based on structures characteristics,roof cable-net structure was installed by integral lifting method,and the installation scheme was introduced in this paper.
结合结构特点,采用整体提升方案进行屋顶索结构安装,并介绍了其安装方案。
2.
This paper has presented the construction technique of the assembling in site about the large-span steel pipe roof truss and the technique of integral lifting about the truss.
本文主要介绍大跨度钢管桁架的现场拼装和整体提升的施工技术措施。
3.
The integral lifting of steel truss in the National Conference Center Project has finished the technical problems that needed to be resolved in four times of steel truss lifting according to the project characteristics and difficulties.
在国家会议中心钢桁架整体提升施工中,根据工程的特点、难点,完成了四次钢桁架提升需要解决的技术问题,充分利用现有的提升支架及结构本身,制定了合理的组装、提升、焊接顺序与工艺,采用计算机控制液压千斤顶群同步提升技术,通过有效的控制,进行了承重系统的平稳转换及卸荷,高空精确合拢,整体达到设计及规范要求。
2)  integral lift
整体提升
1.
Ground assembly and integral lift method was adopted in the construction of the central hall roof structure of CNPC office building.
中石油大厦主中庭屋盖结构施工,采用地面拼装、整体提升的方法,屋盖的面积达1600多m2,为预应力索结构,在国内尚属首次。
2.
As a new installation method for big structures,double girder integral lift is mainly composed of fixed girder,moveable girder,work anchor,moveable anchor,jacks and guide rail.
双梁式整体提升法是一种新型的大型结构安装方法,主要由固定梁、活动梁、钢绞线、工作锚、工具锚、导向装置及千斤顶组成,与现在常用的安装方法相比,具有价廉、安全、高效和易推广等特点。
3.
A stress monitoring scheme was executed to meet the requirement of the Dome integral lift of Lingnan Pearl Stadium in Foshan.
针对佛山岭南明珠体育馆穹顶中心部分的整体提升,制订了提升过程应力监测方案。
3)  integral hoisting
整体提升
1.
Theoretical analysis of integral hoisting of national stadium steel roof;
国家体育场钢屋盖安装整体提升方案计算分析
2.
Application of integral hoisting scaffold in high-rise building;
整体提升脚手架在高层建筑中的应用
3.
The inside ring girder is the key part of all, in this article, the author introduces the main features of inside ring girder and the technique of structure joint treatment, process and making, on site consolidation, integral hoisting .
威海市体育中心体育场挑篷为全张拉空间索膜结构 ,是一种新颖的结构形式 ,其中内环梁是关键 ,本文中介绍了内环梁的特点、结构节点处理、加工制作、现场拼装和整体提升
4)  whole lifting
整体提升
1.
On the safe steps in the process of large span steel honing frame whole lifting;
浅析大跨度钢桁架整体提升过程中的安全措施
2.
In structural project of steel roof of Capital Airport A380 hangar, conditions of forces on rod during whole lifting are reflected through real-time monitoring on overall whole lifting process of large-span steel space frame and steel truss, and theoretical calculations are verified by practical data.
在首都机场A380机库钢屋盖结构工程中,通过对大跨度钢网架、钢桁架一次性整体提升过程中应力全过程、实时监测,反映了整体提升过程中杆件受力情况,达到了用实际数据检验理论计算的效果,为今后此类监测工作起到了借鉴作用,同时也为类似工程提供了宝贵的经验和丰富的数据资料。
3.
In the project of steel roof structure of Capital Airport A380 hangar, research and application of whole lifting technology of large-span steel space frame and steel truss guarantee favorable construction effect.
在首都机场A380钢屋盖结构工程中,通过对大跨度钢网架、钢桁架一次性整体提升技术的研究与应用,在结构施工过程中取得了良好的效果,也在我国大跨度钢屋盖结构施工技术领域有所突破,同时为类似结构施工技术的发展与进步起到推动作用。
5)  the lateral vibration of integral winder
提升机整体振动
6)  integrated vertical lifting method
整体垂直提升法
1.
This paper introduces two kinds of assembling and lifting methods(the integrated vertical lifting method and the sliding method) used in the ball-grid installation,and puts forward some problems existing in the construction.
介绍了球型网架安装过程中使用的整体垂直提升法、滑移法2种拼装和吊装方法,提出了施工中存在的问题。
补充资料:《关于高等学校教师职务名称及其确定与提升办法的暂行规定》
      中华人民共和国国务院于1960年3月5日颁发试行的一项规定。目的是为了鼓励高等学校教师不断提高政治业务水平,努力做好教学工作和科学研究工作。
  
  《暂行规定》规定,高等学校教师职务名称定为教授、副教授、讲师、助教 4级;教师职务名称的确定与提升,以思想政治条件、学识水平和业务能力为主要依据。《暂行规定》对各级职称的具体条件和审批办法等作了规定。《暂行规定》颁布后,对推动高等学校教学、科研工作,加强高等学校教师队伍的建设,起了一定的作用。但在"文化大革命"期间,高等学校确定和提升教师职称的工作中断。1978年 3月,国务院批转了教育部《关于高等学校恢复和提升教师职务问题的报告》,决定恢复高等学校教师职称,并开展提升教师职称工作。为了使高等学校教师提职工作经常化、制度化,教育部于1982年 2月又下达了《关于当前执行〈暂行规定〉的实施意见》,对《暂行规定》作了一些补充。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条