1) high-water-cut stage
注水后期
2) succeeding water injection
后续注水
1.
Study on numerical simulation of succeeding water injection program after polymer flooding in Gudong 8 area.;
孤东八区聚合物驱后续注水方案数值模拟研究
4) long-term water flooding
长期注水
5) cyclic waterflooding
周期注水
1.
Study of numerical simulation of cyclic waterflooding in Li 33-19 well group of Lijin oilfield.;
利津油田利33-19井组周期注水数值模拟研究
2.
Practice and recognition of cyclic waterflooding in Zhuang 45-1 block of Zhuangxi oilfield.;
桩西油田桩45-1块周期注水实践与认识
3.
Analyze Effect of Geologic Factor in Cyclic Waterflooding;
影响周期注水效果的地质因素分析
6) cyclic injection
周期注水
1.
According to the reservoir depositional properties and the distribution law of remaining oil,this paper analyzed the past cyclic injection based on hydrodynamic theories and former experiences.
针对萨北开发区油层沉积特点及特高含水期剩余油分布特点,以水动力学原理为指导,对以往周期注水的效果进行分析,在已有的实践经验基础上,结合数值模拟研究,优化周期注水方式及各项参数,引入了油井间歇采油改变液流方向改善开发效果的做法,在实践中取得了较好的效果。
补充资料:高压注水
分子式:
CAS号:
性质:当压水堆一次冷却剂回路出现小破口时,反应堆系统的压力下降不多。由正常运行的11.5MPa下降到约11MPa时,高压注水系统投入运行。将含硼水注入反应堆冷却剂进堆和出堆的管道中,以迅速补充反应堆所丧失的冷却剂。高压注水系统是应急堆芯冷却系统的一个子系统。
CAS号:
性质:当压水堆一次冷却剂回路出现小破口时,反应堆系统的压力下降不多。由正常运行的11.5MPa下降到约11MPa时,高压注水系统投入运行。将含硼水注入反应堆冷却剂进堆和出堆的管道中,以迅速补充反应堆所丧失的冷却剂。高压注水系统是应急堆芯冷却系统的一个子系统。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条